| Company | Red Eagle Mining Corporation |
| Date | Unknown |
| Commodities | Gold |
Executive Summary
This NI 43-101 Technical Report presents a Feasibility Study for the Santa Rosa Gold Project, operated by Red Eagle Mining Corporation. The document focuses heavily on the recovery methods and process design required to extract gold from the ore body. Section 17 outlines the comprehensive recovery methods, ranging from run-of-mine handling to tailings disposal.
The process design criteria and flowsheet are detailed within the report, covering key stages such as crushing, grinding, flotation, and leaching. Specific attention is given to pre-leach preparation, acid wash procedures, and the use of carbon adsorption and cyanidation circuits. The study also addresses reagents, services, and instrumentation required for plant operation.
While specific operational metrics such as throughput and mine life are not detailed in this specific text snippet, the inclusion of a Feasibility Study indicates the project has progressed beyond exploration into the development phase. The recovery methods suggest a complex metallurgical process involving both physical separation and hydrometallurgical techniques.
Website: https://www.lycopodium.com/case-studies/santa-rosa-gold-project/
Report Date: Unknown
Region:
Project Status:
Commodity: Gold
Throughput:
Mine Life:
Mine Type:
Ore type: