Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China

The Gaocheng processing plant, designed for 528,000 tpa and operating since 2014, uses a flexible crushing and grinding circuit with lead, zinc, and sulphur flotation, plus integrated XRT ore sorting and dry tailings handling.

Report context

The Gaocheng Silver-Lead-Zinc Project is located in Yun'an District, Guangdong Province, China. The preliminary design for the mining and processing operation was completed by GDMAI in April 2011, and the processing plant was commissioned in 2014. The effective date of the technical report is 30 June 2024, with the report dated 20 July 2024.

Processing route

Crushing and screening

The plant uses a two-stage closed-circuit crushing process. Run-of-mine ore with a feed size of no more than 350 mm is drawn from a ROM bin by a vibrating feeder into a primary jaw crusher (PE600×900, 75 kW). The crusher product is screened on a double-deck heavy-duty circular vibrating screen (2YKR2460H, 45 kW). Fines of -15 mm are conveyed to a fine ore bin; +60 mm material feeds the secondary cone crusher (PYH-3Z, 220 kW) via a buffer storage bin; and 15–60 mm material is sent to the XRT intelligent sorting system.

Intelligent ore sorting

An X-ray intelligent sorting line (XRT intelligent sorting) was built and put into trial production in March 2023 to replace a previous hand-sorting operation. The 15–60 mm intermediate products enter two-stage vibrating screens (ZK2142) for washing; the pulp from washing is pumped to the grinding system. The oversize clean ore is distributed to the XRT sorting machine, which discards waste rock to a waste rock silo for sale, while the concentrate returns to the secondary cone crusher buffer bin. As of the report date, the pre-sorting feed size class remains under optimisation.

Grinding and classification

Grinding uses a two-stage closed circuit in two parallel series of 800 tpd each. The first stage is a grate ball mill (MQG2700×3000, 400 kW) with a spiral classifier, and the second stage is an overflow ball mill with a hydrocyclone group. Final overflow fineness is 80% passing 75 µm at a solids concentration of 35% to 38%.

Flotation

The flotation circuit is also configured in two parallel series. Lead flotation is one roughing, two scavengings, and three cleanings to produce lead concentrate. Lead tailings flow to zinc-sulphur mixed flotation (one roughing, two scavengings, one cleaning) producing tailings and a zinc-sulphur mix concentrate. This mix then undergoes zinc-sulphur separation (one roughing, two scavengings, three cleanings) to yield separate zinc and sulphur concentrates.

Concentrate dewatering

Lead, zinc, and sulphur concentrates each use a two-stage dewatering process: thickening to 40%–50% solids, then ceramic filtration to a final moisture content of 10%–12%. Dewatered concentrate is bagged and truck-loaded for smelter delivery.

Tailings handling

Tailings are pumped to a deep cone thickener for concentration, with underflow concentration exceeding 72%. The underflow is directed either to a press filtration system or a backfill system. Dry tailings are conveyed to a tailings storage facility and spread by bulldozer on a bench-by-bench basis.

Tin recovery

One production line recovers tin from flotation tailings by gravity separation.

Key reported parameters

Parameter Value Basis
Designed processing capacity 528,000 tpa (1,600 tpd) Design
Actual annual ore processing volume 260–630 kt Historical operating data
Grinding circuit capacity per line 800 tpd (two parallel lines) Design
Final overflow fineness 80% passing 75 µm Design
Grinding overflow concentration 35%–38% solids Design
Thickener underflow concentration (tailings) >72% Design/operating
Final concentrate moisture 10%–12% Design
ROM feed size ≤350 mm Design
Crushing product size -15 mm Design
Crushing circuit Two-stage closed circuit Design
XRT sorting commissioning March 2023 Trial production
Primary jaw crusher PE600×900, 75 kW, 1 unit Equipment table
Secondary cone crusher PYH-3Z, 220 kW, 1 unit Equipment table
Main screens 2YKR2460H, 45 kW (1); ZKB2240 washing, 15 kW×2 (2) Equipment table
XRT sorting machine KK104-24-M, 22 kW, 1 unit Equipment table
Grate ball mill MQG2700×3000, 400 kW, 2 units Equipment table
Fine ore bins 718 m³ each, 2 units Equipment table

Technical qualifications

The report notes that the XRT intelligent sorting system, built in March 2023, is still in the process of adjustment and optimisation. The feed size class of the pre-sorting system is also under optimisation. The processing plant is designed for flexible operation: one or two grinding and flotation lines may run depending on mining supply quantity, with actual annual ore throughput ranging from 260 kt to 630 kt. No performance or economic data are provided in this recovery method section.

*Source: Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China, effective 30 June 2024, Section 17 Recovery Method.*