Klondike Silver — Technical Report Excerpt

Klondike Silver — Technical Report Excerpt

Company Klondike Silver
Date Undated
Commodities Lead, Silver, Zinc
Throughput 100 tpd

Executive Summary

This report details the operational configuration of the Klondike Silver processing facility, which utilizes a flotation mill with a capacity of 100 tonnes per day. The facility has historically produced two distinct concentrates: a lead-silver dominant concentrate and a zinc-dominant concentrate.

The site infrastructure is supported by hydroelectric power provided by BC Hydro and utilizes water sourced from Tributary Creek. The facility operates under six active water use permits, and the proximity of the water source ensures a consistent, year-round supply for processing operations.

Key Data

Website: https://klondikesilver.com/investor-resources/presentations/

Report Date: Undated

Region: 

Project Status:

Commodity: Lead, Silver, Zinc

Throughput: 100 tpd

Mine Life: 

Mine Type: 

Ore type: 