Mineral Processing Circuit of Westwood Mine

The Westwood Mine processing circuit is a comprehensive gold recovery system utilizing cyanidation with carbon adsorption, built upon a refurbished Doyon Mill facility. The circuit was significantly upgraded between 2011-2013 to optimize gold recovery from Westwood ore.

Processing Flow and Equipment:

1. Ore Handling:

– Underground ore is transported 2.5km by truck to the mill

– Single-stage jaw crusher (1.07m x 1.22m) with grizzly feeder

– Belt conveyor system to mill bins (2,800 dmt capacity each)

2. Grinding Circuit:

– 2,700 HP SAG mill in closed circuit with primary hydrocyclones

– 1,000 HP ball mill with secondary hydrocyclones

– Target grind size: 80% passing 53 microns (270 mesh)

3. Gravity Recovery:

– Secondary cyclone underflow feeds gravity circuit

– Equipment includes Sweco screen, 30″ Knelson concentrator, shaking table

– Gravity concentrate sent directly to refinery

– Tailings return to grinding circuit

4. Leaching and Adsorption:

– 55 hours total retention time at 3,106 tpd nominal rate

– Circuit breakdown:

• Primary leach tanks: 4.7 hours

• CIL tanks: 6.6 hours

• Secondary leach tanks: 31.3 hours

• CIP tanks: 12.1 hours

5. Gold Recovery:

– Acid wash vessel and high-pressure Zadra stripping reactors

– Two parallel electrowinning cells

– Gold sludge filtered, dried, and smelted into doré bars

– Carbon regeneration kiln for reactivation

– Carbon attrition system for fresh carbon preparation

6. Tailings Management:

– SO2/Air cyanide destruction process

– Two parallel detox reactors

– Split between paste backfill plant and Doyon open pit disposal

– Buffer tank with 14 hours capacity for backfill feed continuity

7. Paste Backfill System:

– Two 2km pipelines (feed and return)

– Designed for 144.6 tph maximum (operating at 70 tph)

– Two circuits for simultaneous stope filling

– Water recovery system to mill

Key Operational Parameters:

– Annual throughput: 1,100,000 tpy (after optimization)

– Mill availability: 96%

– Operating weeks/year: 52

– Design capacity: 2,425 tpd

Reagent Consumption (annual):

– Cyanide: 945,000 kg

– Quick lime: 5,640,000 kg (combined mill and environmental)

– SO2: 1,118,000 kg

– Slag/cement: 8,273,000 kg (backfill)

– Grinding media: 1,805,000 kg

Innovations and Notable Features:

– Refurbishment of 1970s Doyon Mill with modern equipment

– Optimized throughput increased capacity from 850,000 to 1,100,000 tpy

– Dual-purpose tailings management (backfill and pit disposal)

– Sophisticated paste backfill system with water recovery

– Comprehensive cyanide destruction circuit

Technical Challenges and Solutions:

1. Zinc Recovery Consideration:

– Initial assessments showed potential for zinc recovery

– Subsequent studies deemed uneconomical

– Solution: Process high-grade zinc ore through cyanidation only

2. Tailings Management:

– Existing Doyon tailings facilities nearing capacity

– Solution: Utilize Doyon open pit (11.3 MCUM capacity)

– Environmental criteria met for pit disposal

3. Throughput Optimization:

– Original design capacity of 850,000 tpy

– Solution: Circuit upgrades increased to 1,100,000 tpy

4. Power Management:

– Mill represents 8% of total milling cost

– Solution: Adequate contract with Hydro-Quebec (30,000 kW max)

Water Management:

– Primary source: Tailings management facility and Doyon system

– Secondary source: Bousquet River

– Annual treatment: 4.0-4.5 MCUM in HDS plant

– Water recycling from backfill plant to mill

The processing circuit demonstrates a well-integrated system combining modern gold recovery techniques with efficient tailings management and backfill production, all while maintaining environmental compliance through comprehensive cyanide destruction and water treatment systems.

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Technical Report on the Westwood Complex

Technical Report on the Westwood Complex

Company IAMGOLD
Date 2025
Region Quebec, Canada
Commodities Gold, Silver
Mine Type Underground
Throughput 3,106 tpd
Mine Life LOM
Status Operating

Executive Summary

This technical report details the recovery methods and operational status of the Westwood Complex in Quebec, Canada, operated by IAMGOLD. The process plant, originally constructed in the 1970s, underwent a significant refurbishment in 2013 to increase throughput to 1.0 Mt/a. Upgrades were implemented across the grinding, cyanidation, strip, and tailings cyanide destruction circuits, alongside the construction of a new paste backfill plant to meet operational needs. The facility is designed to operate continuously 24/7, though batch mode operations are planned for periods of reduced ore availability.

The plant treats underground ore via a conventional cyanidation process. Run-of-mine ore is crushed in a single-stage jaw crusher and ground using a two-stage semi-autogenous grinding (SAG) mill and ball mill circuit. The flowsheet includes a gravity separation circuit, pre-leach, carbon in leach (CIL), and carbon in pulp (CIP) circuits to produce gold/silver doré. The targeted grind size is 85% passing 75 µm, with a nominal processing rate of 3,106 t/d.

Environmental and waste management are integral to the operation, featuring a SO2/air cyanide destruction process for tailings and a paste backfill plant that utilizes tailings to fill stopes. Two parallel lines connect the process and backfill plants, allowing for simultaneous filling of two stopes with different recipes. Water management involves reclaiming water from the tailings storage facility and the Doyon reclamation system, with fresh water sourced from the Bousquet River. The plant consumes approximately 35–36 kWh/t of power annually.

Reports

Concepts

Website: https://www.iamgold.com/English/operations/westwood/default.aspx

Report Date: 2025

Region: Quebec, Canada

Project Status: Operating

Commodity: Gold, Silver

Throughput: 3,106 tpd

Mine Life: LOM

Mine Type: Underground

Ore type:

Westwood Mine — 2020 Technical Report

Westwood Mine — 2020 Technical Report

Company IAMGOLD
Mine Westwood Mine
Date 2020
Region Quebec, Canada
Commodities Gold, Zinc, Copper

Executive Summary

The NI 43-101 Technical Report for the Westwood Mine outlines the recovery methods and processing facilities designed by IAMGOLD. The processing plant utilizes the existing Doyon Mill, which was refurbished between 2011 and 2013 to accommodate Westwood ore. The design criteria support an annual production of 850,000 tonnes, with a throughput capacity optimized to 1,100,000 tonnes per year. The facility focuses on gold recovery through cyanidation, with provisions for paste backfill and tailings management.

The mill process includes crushing, grinding, gravity separation, and leaching circuits. Underground ore is hoisted and crushed via a single-stage jaw crusher before grinding in a semi-autogenous (SAG) mill and ball mill. Gravity recovery is achieved using Knelson concentrators and shaking tables. The leaching circuit employs a combination of Carbon-in-Leach (CIL) and Carbon-in-Pulp (CIP) tanks, followed by cyanide destruction using the SO2/Air process.

Although a copper-zinc flotation circuit was initially considered for higher-grade zinc ore lenses, it was deemed not economical in the 2018 revision. Consequently, the current operating plan processes zinc ore via cyanidation only, without zinc credits. The tailings are managed through a paste backfill plant for underground support, with excess tailings pumped to the Doyon open pit.

Reports

Website: https://www.iamgold.com/English/operations/westwood/default.aspx

Report Date: 2020

Region: Quebec, Canada

Project Status:

Commodity: Gold, Zinc, Copper

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Westwood Project — 2013 Technical Report

Westwood Project — 2013 Technical Report

Company IAMGOLD Corporation
Date 2013
Region Quebec, Canada
Commodities Gold
Mine Type Underground
Throughput 2,425 tpd
Annual Production 850,000 tonnes/year
Status Development

Executive Summary

The Westwood Project NI-43-101 Technical Report outlines the recovery methods for the Westwood gold project, utilizing the refurbished Doyon Mill. Preliminary assessments indicated potential for zinc recovery, but subsequent drilling failed to validate resources sufficient for flotation capital expenditure. Consequently, the operating plan focuses on gold recovery via cyanidation, with the mill design retaining the potential for future zinc development if resources are identified. The mill refurbishment completed in early 2013 includes gold cyanidation and tailings desulphurization circuits.

The design criteria are based on a mine production plan, the existent Doyon Mill, metallurgical testwork from 2007-2009, and IAMGOLD operational experience. The nominal annual production is set at 850,000 tonnes per year, with an initial phase of 600,000 tpy. The daily mine throughput is the main design constraint, targeting 2,425 tonnes per day at 96% mill availability. All underground ore is hauled to the mill for crushing, grinding, and processing on site.

Processing involves a SAG mill and ball mill circuit followed by gravity separation for free gold recovery. The leaching circuit utilizes cyanidation with carbon absorption and stripping. Tailings management includes a cyanide destruction plant (SO2-AIR detox) and a paste backfill plant moved closer to the shaft to reduce pumping costs. Desulphurization flotation is implemented to treat tailings for environmental rehabilitation of the Doyon tailings ponds.

Website: https://www.iamgold.com/English/operations/westwood/default.aspx

Report Date: 2013

Region: Quebec, Canada

Project Status: Development

Commodity: Gold

Throughput: 2,425 tpd

Mine Life: 

Mine Type: Underground

Ore type:

Westwood Mine: Gold Processing Circuit Upgrades

Overview

The Westwood Mine processing facility is a refurbished version of the original Doyon Mill from the 1970s, upgraded between 2011-2013 to efficiently process Westwood ore. The plant features modernized grinding, leaching, adsorption, and stripping circuits, with enhanced cyanide destruction capacity and a new paste backfill plant to support underground operations.

Key Process Stages

  • Ore Handling: Underground ore is trucked 2.5km to the crusher house, processed through a single-stage jaw crusher (1.07 x 1.22 m) with grizzly feeder
  • Grinding: 2,700 HP SAG mill in closed circuit with hydrocyclones, feeding a 1,000 HP ball mill. Target grind size: 80% passing 53 microns
  • Gravity Separation: Sweco screen, 30″ Knelson concentrator, and shaking table recover gravity gold concentrate
  • Leaching: 55-hour total retention time across primary leach (4.7h), CIL (6.6h), secondary leach (31.3h), and CIP (12.1h) tanks
  • Cyanide Destruction: SO2/Air process with parallel detox reactors and 14-hour buffer capacity for backfill operations
  • Paste Backfill: Dual-circuit system with 2km pipelines, designed for 144.6 tph capacity (operating at 70 tph)
  • Gold Recovery: Zadra stripping reactors, two electrowinning cells, and carbon regeneration kiln producing doré bars
  • Tailings: Disposal in Doyon open pit with partial usage for paste backfill

Critical Data

Parameter Value
Annual Throughput 1,100,000 tonnes
Mill Availability 96%
Daily Processing Rate 3,106 tpd
Power Consumption 8% of milling costs
Water Treatment 4.0-4.5 MCUM annually

Key Reagent Consumption (Annual)

Material Quantity (kg)
Grinding Media 1,805,000
Quick Lime (Total) 5,640,000
Cyanide 945,000
SO2 1,118,000
Slag/Cement 8,273,000