Mineral Processing Circuit of Westwood Mine

The Westwood Mine processing circuit is a comprehensive gold recovery system utilizing cyanidation with carbon adsorption, built upon a refurbished Doyon Mill facility. The circuit was significantly upgraded between 2011-2013 to optimize gold recovery from Westwood ore.

Processing Flow and Equipment:

1. Ore Handling:

– Underground ore is transported 2.5km by truck to the mill

– Single-stage jaw crusher (1.07m x 1.22m) with grizzly feeder

– Belt conveyor system to mill bins (2,800 dmt capacity each)

2. Grinding Circuit:

– 2,700 HP SAG mill in closed circuit with primary hydrocyclones

– 1,000 HP ball mill with secondary hydrocyclones

– Target grind size: 80% passing 53 microns (270 mesh)

3. Gravity Recovery:

– Secondary cyclone underflow feeds gravity circuit

– Equipment includes Sweco screen, 30″ Knelson concentrator, shaking table

– Gravity concentrate sent directly to refinery

– Tailings return to grinding circuit

4. Leaching and Adsorption:

– 55 hours total retention time at 3,106 tpd nominal rate

– Circuit breakdown:

• Primary leach tanks: 4.7 hours

• CIL tanks: 6.6 hours

• Secondary leach tanks: 31.3 hours

• CIP tanks: 12.1 hours

5. Gold Recovery:

– Acid wash vessel and high-pressure Zadra stripping reactors

– Two parallel electrowinning cells

– Gold sludge filtered, dried, and smelted into doré bars

– Carbon regeneration kiln for reactivation

– Carbon attrition system for fresh carbon preparation

6. Tailings Management:

– SO2/Air cyanide destruction process

– Two parallel detox reactors

– Split between paste backfill plant and Doyon open pit disposal

– Buffer tank with 14 hours capacity for backfill feed continuity

7. Paste Backfill System:

– Two 2km pipelines (feed and return)

– Designed for 144.6 tph maximum (operating at 70 tph)

– Two circuits for simultaneous stope filling

– Water recovery system to mill

Key Operational Parameters:

– Annual throughput: 1,100,000 tpy (after optimization)

– Mill availability: 96%

– Operating weeks/year: 52

– Design capacity: 2,425 tpd

Reagent Consumption (annual):

– Cyanide: 945,000 kg

– Quick lime: 5,640,000 kg (combined mill and environmental)

– SO2: 1,118,000 kg

– Slag/cement: 8,273,000 kg (backfill)

– Grinding media: 1,805,000 kg

Innovations and Notable Features:

– Refurbishment of 1970s Doyon Mill with modern equipment

– Optimized throughput increased capacity from 850,000 to 1,100,000 tpy

– Dual-purpose tailings management (backfill and pit disposal)

– Sophisticated paste backfill system with water recovery

– Comprehensive cyanide destruction circuit

Technical Challenges and Solutions:

1. Zinc Recovery Consideration:

– Initial assessments showed potential for zinc recovery

– Subsequent studies deemed uneconomical

– Solution: Process high-grade zinc ore through cyanidation only

2. Tailings Management:

– Existing Doyon tailings facilities nearing capacity

– Solution: Utilize Doyon open pit (11.3 MCUM capacity)

– Environmental criteria met for pit disposal

3. Throughput Optimization:

– Original design capacity of 850,000 tpy

– Solution: Circuit upgrades increased to 1,100,000 tpy

4. Power Management:

– Mill represents 8% of total milling cost

– Solution: Adequate contract with Hydro-Quebec (30,000 kW max)

Water Management:

– Primary source: Tailings management facility and Doyon system

– Secondary source: Bousquet River

– Annual treatment: 4.0-4.5 MCUM in HDS plant

– Water recycling from backfill plant to mill

The processing circuit demonstrates a well-integrated system combining modern gold recovery techniques with efficient tailings management and backfill production, all while maintaining environmental compliance through comprehensive cyanide destruction and water treatment systems.