Björkdal Gold Mine: Evolving Gravity-Flotation Processing Circuit

Overview

The Björkdal gold processing plant, originally commissioned in 1989, has undergone numerous upgrades to increase throughput while maintaining gold recovery. The circuit combines crushing, grinding, gravity concentration, and flotation to produce multiple gold concentrates.

Key Process Stages

  • Crushing Circuit: Three-stage crushing (primary jaw + secondary/tertiary cone crushers) to achieve P80 of 8mm
  • Grinding Circuit: Parallel primary ball/rod mills (No.1 & No.2) with classifying screen, secondary ball mill (No.3) for regrinding
  • Gravity Concentration: Rougher/cleaner spirals → shaking tables → Knelson concentrators → final cleaner tables producing 60% Au concentrate
  • Flotation Circuit: SkimAir flash flotation → rougher/scavenger flotation → two-stage cleaning producing final concentrate
  • Recent Upgrades: G-max cyclone battery (2021), ball mill conversion to grate discharge (2023), toe position measurement system (2024)

Critical Data

Parameter Value
Primary Grinding P80 560 µm
Primary Cyclone Underflow P80 800 µm
Secondary Ball Mill Discharge P80 475 µm
Primary Cyclone Overflow P80 230 µm
Flotation Cyclone Overflow P80 125 µm
Gravity Concentrate Grade 60% Au
Middlings Grade 1,500 g/t Au

Historical Modifications

Year Modification
1990 750 kW regrind mill installed
1992 Sala 6.6 m³ flotation cell added
2005 Knelson CD12 + 7.5 kWh regrind mill installed
2009 Knelson XD30 installed pre-flotation
2013 Reichert cones replaced by rougher spirals, SkimAir-240 installed
2017 Flotation expansion for increased capacity/recovery
2018 Mintek Expert Process Control System installed

Planned Improvements

The recent conversion of Ball Mill 2 from overflow to grate discharge has shown significant grinding efficiency improvements, with further throughput gains expected. The new toe position measurement system (2024) will optimize mill performance.