Pinson Project — 2012 Technical Report

Company Atna Resources, Ltd.
Date 2012
Region Not Specified in Text
Commodities Not Specified in Text
Status Development

Executive Summary

This section of the NI 43-101 Technical Report outlines the proposed recovery methods for the Pinson Project. The strategy involves crushing the ore and separating it into oxide and sulfide stockpiles. All ore will be shipped offsite for processing by a third-party contractor. Atna Resources (ARI) has established contracts to sell oxide ore and to process sulfide ore with a third party. Revenue for oxide ore is generated through sales, while sulfide ore processing involves a payment to the processor based on a sliding scale indexed to head grade, plus a treatment charge estimated at approximately $80 per ton. Detailed recovery results are referenced in the Mineral Processing and Metallurgical Testing section of the full report.

Reports

Website: https://miningrecord.com/atna-resources-acquires-pinson-gold-mine/

Report Date: 2012

Region: Not Specified in Text

Project Status: Development

Commodity: Not Specified in Text

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top