Amulsar 2019 Feasibility Study Crushes 10 Mtpa to 19 mm for a Heap Leach on a 120 m Valley-Fill Pad With CIC and AARL Gold Recovery

Lydian's 2019 feasibility study for the Amulsar gold project in Armenia keeps the 2017 flowsheet, with most major equipment already installed. The one addition is a third secondary crusher. A 5.3 km downhill overland conveyor generates about 3 MW.

The Feasibility Study Technical Report, Amulsar Project, Armenia, was prepared by JDS Energy & Mining for Lydian International Ltd., with an effective date of September 16, 2019 and a report date of October 15, 2019. Its recovery methods are taken from the 2017 Amulsar NI 43-101 by Samuels Engineering. No new metallurgical testwork had been done since then, and the flowsheet was unchanged except for a third secondary crusher and ancillary equipment. The mine plan had changed, lowering average life-of-mine throughput to 10.0 Mtpa from 10.4 Mtpa in 2017. The plant receives about 27,400 t/d of run-of-mine ore, crushes it in two stages, and heap leaches it. Gold is recovered in a carbon-in-column (CIC) and adsorption-desorption-recovery (ADR) plant as doré. LOM gold grade is 0.74 g/t at a recovery of 87.5%.

Critical Data

Parameter Value Unit Notes
Report effective date September 16, 2019 Not applicable JDS for Lydian International Ltd.
Throughput 10.0 Mtpa (27,400 t/d) Not applicable Down from 10.4 Mtpa in 2017
Gold grade and recovery 0.74 g/t, 87.5% Not applicable LOM average, 2019 gold model
Crushing rate About 1,522 to 1,563 t/h Not applicable Average and design
Crush size P94 19 mm Not applicable Screen undersize P85 18 mm
Primary crusher Jaw, to P80 91 mm Not applicable 600 t dump hopper, 540,000 t ROM stockpile
Secondary crushing Three cone crushers in parallel Not applicable Third crusher added in 2019
Overland conveyor 5.3 km, 700 m drop Not applicable Regenerates about 3 MW
Leach 6 L/h/m², 60-day cycle Not applicable Drip emitters and sprinklers
Leach pad About 1,348,900 m² in five phases Not applicable 120 Mt heap, 120 m maximum height
Carbon adsorption Five 4 t CIC columns Not applicable Single train
Elution AARL, 4 t column, two strips a day Not applicable 3% NaCN, 2% NaOH at 115°C

Overview

Run-of-mine ore is crushed in a primary jaw crusher. Triple-deck screens and three secondary cone crushers produce the final product. An overland conveyor carries it to a crushed ore stockpile and truck loadout bin. Pebble lime is added, and contract trucks haul the ore to the heap leach pad, where it is stacked in 8 m lifts and irrigated with dilute cyanide. Pregnant solution drains to a process pond and is pumped through five carbon columns. Loaded carbon is acid washed, stripped by the AARL method, regenerated in a kiln and returned. Gold is electrowon and refined to doré.

Key Process Stages

Primary crushing and screening. Trucks tip into a 600 t live dump hopper or onto a 540,000 t ROM stockpile, with a rock breaker for oversize. An apron feeder and vibrating grizzly feed the jaw crusher. A 1,600 t crushed ore bin feeds three triple-deck multi-slope screens. Undersize at P85 18 mm goes to the overland conveyor, and oversize goes to the secondary crushers. A crushed ore sampler handles metallurgical accounting.

Overland conveying and loadout. The conveyor descends 700 m over 5.3 km. Its regenerative drives return about 3 MW, roughly what the crushing circuit uses. Three pan feeders under a 5,000 t live stockpile reclaim onto the loadout conveyor, where a screw feeder adds pebble lime from a 200 t silo. A 100 t loadout bin holds three truck loads.

Stacking. A local contractor hauls ore in 30 t trucks, and the Phase 1 pad needs an estimated 13 trucks. A dozer maintains the tip head and rips the surface before irrigation.

Heap leach facility. The pad sits in a valley at Site 28. It has a composite liner of LLDPE geomembrane (1.5 mm where the heap is 60 m or less, 2 mm elsewhere) over a compacted low-permeability soil liner or geosynthetic clay liner. A drain pipe network lies in a 0.6 m granular layer. The heap is stacked in five stages over 12 years at 10.0 Mtpa.

Carbon adsorption. Pregnant solution flows by gravity through five stepped, flared columns that keep carbon bed expansion at about 70% over a range of flow rates. Carbon is advanced counter-current by recessed impeller pump, and fresh or reactivated coconut carbon is added to column 5.

Acid wash, elution and reactivation. Loaded carbon is washed with dilute nitric acid for one to two hours and neutralized with 2 to 5% NaOH. Strip solution of 3% NaCN and 2% NaOH at 115°C soaks the carbon for about 30 minutes. Six bed volumes of water at about 115°C then produce the pregnant eluate. Carbon is reactivated in a rotary kiln at 550 to 700°C under steam. Fresh carbon is attrited for 20 to 30 minutes before use, which generates 3 to 5% fines.

Additional Interesting Data and Summary

A stock-proof mesh fence surrounds the leach pad to keep wildlife out and to deter unauthorized access. In-line samplers on the pregnant feed and the barren solution track adsorption performance. Pre-development site grades at the pad range from 4 to 6% in the valley bottoms to 55% on the upper sides. Fill placed at the toe of the Phase 1 pad creates a bench with a 1% downhill gradient for heap stability.

In summary, the 2019 Amulsar feasibility study is a two-stage crushing and valley-fill heap leach operation at 10 Mtpa. Ore reaches the pad by a power-generating overland conveyor, and gold is recovered in a conventional CIC, AARL and electrowinning plant.

Key Processes

  • Jaw crushing, screening and secondary cone crushing to P94 19 mm
  • Regenerative overland conveying
  • Lime addition and truck stacking on a lined valley-fill pad
  • Cyanide heap leaching with drip and sprinkler irrigation
  • Carbon-in-column adsorption
  • Nitric acid wash, AARL elution and kiln reactivation
  • Electrowinning and smelting to doré

Source: Feasibility Study Technical Report, Amulsar Project, Armenia, prepared by JDS Energy & Mining Inc. for Lydian International Ltd., effective date September 16, 2019.

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Amulsar Gold Project — 2015 Value Engineering Technical Report

Amulsar Gold Project — 2015 Value Engineering Technical Report

Company Lydian International Limited
Date 2015
Region Armenia
Commodities Gold, Silver
Mine Type Open Pit
Throughput 30,000 tpd
Mine Life 10 years
Annual Production 10,500,000 tpy
Status Development

Executive Summary

This Value Engineering and Optimization Technical Report details the Amulsar Gold Project located in south-central Armenia. The project underwent significant design optimization to reduce capital expenditure without negatively impacting operating costs or incurring adverse environmental effects. The mining method is open pit, and the processing method is heap leaching with a Carbon-in-Column (CIC) circuit followed by Merrill-Crowe refining. The optimization resulted in reduced initial capital mining fleet, reduced comminution and conveying capital equipment, and refined haul roads.

The project is currently in the development phase with a planned construction completion in November 2016. It has a mine life of 10 years with an annual throughput of 30,000 tonnes per day. The ore is highly fractured and amenable to heap leaching at a crush size of 19 mm. Gold recoveries are predicted at approximately 87.1% to 87.5% depending on the deposit zone (Artavasdes, Tigranes, Erato). Silver recoveries are lower, ranging from 4.8% to 11.2%. The project economics show a strong IRR of 21.6% and NPV of $337.8 million at 5%.

Processing Profile

  • Crushing: Primary Jaw Crusher, Secondary Cone Crushers (2)
  • Milling: N/A
  • Flotation: N/A
  • Leaching: Heap Leach (19 mm crush size)
  • Recovery: Carbon-in-Column (CIC), Adsorption-Desorption-Recovery (ADR), Merrill-Crowe (Zinc Precipitation)

Reports

Website: https://www.ebrd.com/home/what-we-do/projects/independent-project-accountability-mechanism/case-registry/lydian-amulsar-gold-mine-extension.html

Report Date: 2015

Region: Armenia

Project Status: Development

Commodity: Gold, Silver

Throughput: 30,000 tpd

Mine Life: 10 years

Mine Type: Open Pit

Amulsar Gold Project — 2013 Technical Report

Amulsar Gold Project — 2013 Technical Report

Company Lydian International Limited
Date 2013
Region Armenia
Commodities Gold, Silver
Mine Type Open Pit
Throughput 5 Mtpa (Phase 1), 10 Mtpa (Phase 2)
Mine Life 12 years
Annual Production 118,341 oz (Phase 1), 186,047 oz (Phase 2)
Status Development

Executive Summary

The Amulsar Gold Project, located in south-central Armenia, is a high-sulphidation epithermal gold-silver deposit owned by Lydian International Limited. A feasibility study completed in 2012 outlines a conventional open-pit mining operation with a planned mine life of 12 years. The project is currently in the development phase, with detailed engineering and construction planned to commence following the feasibility study completion. The operation targets an initial throughput of 5 million tonnes per annum (Mtpa), ramping up to 10 Mtpa in Year 4, with steady-state annual gold production ranging from 118,341 oz to 186,047 oz depending on the phase.

Processing involves a three-stage crushing circuit reducing ore to 80% passing 12 mm, followed by transport via overland conveyor to a heap leach facility. The heap leach pad is designed in three phases with a capacity of 95 Mt of ore. Gold recovery is achieved through cyanide leaching followed by an Adsorption-Desorption-Regeneration (ADR) plant using carbon columns, electrowinning, and smelting to produce doré bars. The project demonstrates strong economics with a pre-tax IRR of 27.7% and a net present value of US$646 million at a 5% discount rate, based on a gold price of US$1,200/oz.

Processing Profile

Reports

Website: https://www.ebrd.com/home/what-we-do/projects/independent-project-accountability-mechanism/case-registry/lydian-amulsar-gold-mine-extension.html

Report Date: 2013

Region: Armenia

Project Status: Development

Commodity: Gold, Silver

Throughput: 5 Mtpa (Phase 1), 10 Mtpa (Phase 2)

Mine Life: 12 years

Mine Type: Open Pit

Ore type:

Mineral processing basics