Higginsville-Beta Hunt Operation — 2020 Technical Report

Figure 17.1: Higginsville Process Flowsheet 2020

This technical report presents mineral processing and recovery methods for the Higginsville-Beta Hunt operation in the Eastern Goldfields of Western Australia, as of December 31, 2020.

Report context

This NI 43-101 technical report is dated January 29, 2021, with an effective date of December 31, 2020, prepared for Karora Resources Inc. The operation comprises the Beta Hunt mine, the Higginsville Gold Operations, and the Mt Henry Project, all located in the Eastern Goldfields of Western Australia.

Processing route

Process description

The processing facility at the Higginsville Gold Operation employs a conventional gold recovery circuit comprising crushing, grinding, gravity and intensive cyanidation, leaching and adsorption, carbon stripping, electro-winning, refining, and carbon regeneration. Tailings disposal completes the process.

Crushing and grinding

The process begins with a crushing stage followed by grinding. No further flowsheet details regarding specific crusher types, grinding mill dimensions, or circuit configurations are provided in this section.

Gravity and intensive cyanidation

A gravity concentration circuit is incorporated, with intensive cyanidation applied to gravity concentrates. No further performance data or design specifications are reported.

Leaching and adsorption

The ground material proceeds to leaching and adsorption stages for gold recovery from solution.

Carbon stripping, electro-winning, refining, and carbon regeneration

Loaded carbon is stripped of gold, which is then recovered via electro-winning and refined. Carbon is regenerated for reuse in the adsorption circuit.

Tailings disposal

Tailings from the process are disposed of to a tailings storage facility. No design or performance details for the tailings storage facility are provided.

Plant services

Supporting plant services are included in the process facility but are not described in detail.

Key reported parameters

Parameter Value Basis
Gold recovery Reported as plant performance data Historical operating data

Project website: https://www.westgold.com.au/gold-operations/southern-goldfields/beta-hunt

*Note: No specific recovery percentage values are provided in the cited source material. The report notes gold recoveries are discussed in Section 17.2.1 but does not present numerical recovery data in the available text.*

Technical qualifications

This report is based solely on the original technical report markdown evidence provided. The following limitations apply:

  • No flowsheet details, performance specifications, economics, ownership information beyond the named company, current operational status, or external links are available from the source material.
  • The mineral processing section (Section 17) describes the process route but does not provide detailed design parameters, equipment specifications, or numerical performance targets.
  • Historical operating data for plant performance is referenced as Section 17.2.1 but no numerical values are included in the provided text.
  • Testwork data is not presented in the processing sections of the provided evidence.
  • This is a single point-in-time report with an effective date of December 31, 2020, and does not represent current operational status.

Source: NI 43-101 Technical Report, Higginsville-Beta Hunt Operation, Eastern Goldfields, Western Australia, Report Date: January 29, 2021, Effective Date: December 31, 2020, Sections 17.1-17.2.