admin

Trinidad/Taunus Project — 2012 Technical Report

This 2012 Pre-Feasibility Study outlines the processing methodology for the Trinidad/Taunus Project, focusing on a heap leach recovery circuit. The proposed operation involves crushing run-of-mine ore to a fine size, agglomerating it with cement, and stacking it on a lined pad for cyanide leaching. The design targets an average throughput of 4,300 tonnes per day, with an annual capacity of 1.55 million tonnes.

Trinidad/Taunus Project — 2012 Technical Report Read Post »

Zafranal Project — 2023 Technical Report

The Zafranal Project in Peru features a dual processing strategy comprising a concentrator and a dump leach/SX-EW facility. The concentrator is designed to process 44,000 t/d of copper and gold-bearing plant feed material from an open pit operation, producing a marketable copper flotation concentrate containing 28% copper and approximately 3 g/t of gold. The metallurgical processing procedures were based on test work performed at G&T and Plenge.

Zafranal Project — 2023 Technical Report Read Post »

Figure 17-1: Process Block Flow Diagram

Battery Hill Manganese Project — 2022 Technical Report

This NI 43-101 Technical Report outlines the recovery methods for the Battery Hill Manganese Project located in New Brunswick, Canada. The project focuses on the production of High Purity Manganese Sulphate Monohydrate (HPMSM), a specialty product used primarily for battery applications. The process design is based on the reactivity of manganese silicate mineralization to dilute sulphuric acid, supported by developmental test programs and mass balance modeling using Metsim.

Battery Hill Manganese Project — 2022 Technical Report Read Post »

Bloom Lake Mine — 2023 Technical Report

Quebec Iron Ore (QIO) operates the Bloom Lake Mine facilities, which include two distinct concentrator phases. Phase I was restarted in 2018, while Phase II commenced operations in 2022. The combined design yearly production capacity for the facility is 15 million tonnes per year (Mtpy) of concentrate, sourced from the Pignac, West, and Chief’s Peak pits. The processing flowsheets were developed based on initial Phase II designs and extensive testing and piloting results conducted in partnership with Mineral Technologies.

Bloom Lake Mine — 2023 Technical Report Read Post »

Los Ricos North PEA — 2023 Technical Report

This report details the recovery methods for the Los Ricos North project, designed to treat both oxide and sulphide deposits. The process plant is designed for a nominal throughput of 8,000 tpd. Initially, four oxide deposits will be processed via conventional tank leaching and Merrill Crowe precipitation. Commencing in year nine, the plant will transition to processing sulphide material from the Orito Deposit via conventional flotation operations, at which point the leaching and Merrill Crowe operations will shut down.

Los Ricos North PEA — 2023 Technical Report Read Post »

Yellow Giant — 2011 Technical Report

This technical report outlines the recovery methods for the Yellow Giant mineralization on the Banks Island Mineral Property. The report establishes that gold is strongly associated with sulphide mineralization, specifically massive sulphides, which allows for effective separation from low-density gangue using gravity methods. Heavy Liquid Separation (HLS) testing conducted in 2011 demonstrated high gold recoveries of 87.6% at a coarse crush size of ¼ inch, supporting the viability of a gravity process.

Yellow Giant — 2011 Technical Report Read Post »

Sensor-Based Ore Sorting in Mining: The Complete Guide to XRT, Optical, and Laser Sorting

Sensor-based ore sorting uses XRT, optical, laser, NIR, and electromagnetic sensors to examine individual rock particles and reject barren waste before milling, cutting energy and water use while improving head grade. This complete guide covers every sensor technology, how a sorter is engineered, the economics of pre-concentration, ore amenability testing, and the future of multi-sensor fusion and underground sorting.

Sensor-Based Ore Sorting in Mining: The Complete Guide to XRT, Optical, and Laser Sorting Read Post »

Dewatering in Mineral Processing: The Complete Guide to Thickeners, Filters, and Centrifuges

Dewatering in mineral processing encompasses thickening, filtration, and centrifugal separation to remove water from concentrates and tailings, recover process water for recycle, and prepare products for shipment or storage. This complete guide covers conventional, high-rate, and paste thickeners, vacuum and pressure filters, centrifuges, flocculant selection, water balance management, product moisture specifications, and troubleshooting of the most common dewatering failures.

Dewatering in Mineral Processing: The Complete Guide to Thickeners, Filters, and Centrifuges Read Post »

Scroll to Top