admin

Pebble Project — 2022 Technical Report

This NI 43-101 Technical Report outlines the recovery methods for the Pebble Project, a large-scale copper-gold-molybdenum deposit. The processing plant is designed with a feed rate of 180,000 tons per day, utilizing a SABC (SAG mill, Ball mill, Pebble crusher) circuit for comminution. The ore is processed to produce two principal products: a copper-gold flotation concentrate and a molybdenum flotation concentrate, along with a tertiary gravity gold concentrate.

Pebble Project — 2022 Technical Report Read Post »

Scroll to Top