Mineral Ridge Project — 2020 Technical Report

Titan Mining Corporation’s December 2020 NI 43-101 Technical Report outlines a proposed processing plant designed to re-process gold heap leach residual material at the Mineral Ridge Project in Esmeralda County, Nevada. The facility is designed for a throughput of 4,000 tons per day (1,460,000 tons per annum) with an equipment availability of 92%. The primary objective is to recover gold and silver from heap leach residues and remnant open pit material using a conventional comminution and carbon-in-leach (CIL) cyanidation circuit.

Mineral Ridge Project — 2020 Technical Report Read Post »

Figure 17-1: Supergene Process Flow Sheet

NI 43-101 Technical Report on Quebrada Honda I and II Feasibility Study 2020

This NI 43-101 Technical Report outlines the feasibility study for the Quebrada Honda I and II project in Chile. The project involves two distinct processing streams: an existing supergene heap leach operation and a new QH1-2 concentrator plant. The existing operation utilizes heap leaching and SX/EW for copper recovery, while the new plant design includes primary gyratory crushing, SAG and ball milling, flotation, and concentrate thickening. Active mining temporarily ceased in 2013 and is scheduled to recommence in 2021.

NI 43-101 Technical Report on Quebrada Honda I and II Feasibility Study 2020 Read Post »

Voyageur Barite Projects — Technical Report

This technical report section outlines the recovery methods for barite mined from the Tiger Ridge Mine at Jubilee Mountain and the Pedley Mountain prospects. Historically, barite from these locations has been utilized as oil well drilling mud additives. The current conceptual plan involves crushing mineralized Run-Of-Mine (ROM) rock to -3/4 inch size and processing it through coarse and fine mineral jigs at the mine site. Gravity separation separates the feed into an overflow waste stream and an underflow high-density barite product.

Voyageur Barite Projects — Technical Report Read Post »

Galore Creek Copper–Gold Project — 2011 Technical Report

This section of the NI 43-101 Technical Report outlines the proposed process plant design for the Galore Creek Copper–Gold Project. The facility is designed to process a blend of material from various zones of the deposit, primarily the Central Zone, using conventional crushing, grinding, and flotation methods. The plant is designed to operate continuously at 365 days per year with a nominal throughput of 95,000 tonnes per day, capable of handling up to 110,000 tonnes per day depending on ore competence.

Galore Creek Copper–Gold Project — 2011 Technical Report Read Post »

Figure 17-1: Process Flowsheet

Carlin Vanadium Project — 2020 Technical Report

This NI 43-101 Technical Report presents a Preliminary Economic Assessment (PEA) for the Carlin Vanadium Project located in Nevada, USA. The project is currently in the development stage, with a planned mine life of 16 years. The operation involves an open pit mine supplying mill feed to a processing facility designed to treat two distinct mineralization types: oxide and non-oxide mudstone-hosted mineralization. The process design assumes mineralization supply from active mining for the first 11 years, followed by stockpile treatment and acid-plant only operation.

Carlin Vanadium Project — 2020 Technical Report Read Post »

Figure 17-1: Process Flowsheet

Porcupine Complex — 2024 Preliminary Economic Assessment

The Porcupine Complex, located in Timmins, Ontario, Canada, is a multi-mine operation comprising the Dome, Borden, Hoyle Pond, and Pamour sites. Currently operated by Newmont, the project is the subject of a 2024 Preliminary Economic Assessment (PEA) by Discovery Silver, who are in the process of acquiring the assets. The complex has a long operating history dating back to 1910 at the Dome site, with significant infrastructure already in place including processing plants, tailings storage facilities, and power distribution networks.

Porcupine Complex — 2024 Preliminary Economic Assessment Read Post »

Bucko Lake Nickel Project PEA — 2023 Technical Report

The Bucko Lake Nickel Project is currently in care and maintenance following suspension of operations in 2012. The process plant has been mothballed with minimal equipment deterioration and is planned for reactivation. The proposed reactivation involves increasing the process plant capacity from the original nominal 1,000 tpd to 1,500 tpd, representing a 50% increase over the previous design capacity.

Bucko Lake Nickel Project PEA — 2023 Technical Report Read Post »

Figure 17.3.1 Schematic Overall Process Flow Diagram

Nico Young Project PEA — 2019 Technical Report

This Pre-Feasibility Study (PEA) outlines the recovery methods for the Nico Young Project, located near Young, Australia. The project focuses on the extraction of Nickel and Cobalt from laterite ore bodies, specifically Limonite, Saprolite, and Serpentinite types. The proposed processing plant is designed for an annual throughput of 3 million tonnes per annum (Mtpa), utilizing a heap leaching circuit followed by a solvent extraction refinery to produce high-value nickel sulphate and cobalt sulphide products.

Nico Young Project PEA — 2019 Technical Report Read Post »