| Company | Crocodile Gold Corporation |
| Mine | Big Hill |
| Date | Not Specified |
| Region | Not Specified |
| Commodities | Gold |
| Status | Development |
Executive Summary
The technical report outlines the mineral processing facilities utilized at the Big Hill project, operated by Crocodile Gold Corporation. The gold processing facilities employ a standard Carbon-In-Leach (CIL) gold recovery circuit that follows crushing, grinding, and sulphide flotation. The treatment plant is structured around five unit processes: size reduction, gravity gold recovery, flotation/ultra-fine grinding, leach-adsorption, and gold recovery.
Testing conducted on samples from the Big Hill northern and southern (Davis Pit extension) areas indicates that flotation and regrind are not required for the oxide ore. Consequently, the current processing flow sheet bypasses the flotation section for stockpiled oxide ores. The plant is geographically divided into five main areas, including the primary crushing circuit, milling circuit, flotation/ultra-fine grinding circuit, leach-adsorption circuit, and the elution/electrowinning circuit.
Processing Profile
Reports
Website: https://www.proactiveinvestors.com/companies/news/101665/crocodile-gold-projects-125-pre-tax-irr-for-big-hill-project-54565.html
Report Date: Not Specified
Region: Not Specified
Project Status: Development
Commodity: Gold
Throughput:
Mine Life:
Mine Type:
Ore type:

