Silvertip Mill Floats Lead-Silver and Zinc Concentrates and Splits Pyrite Tailings Between Paste Backfill and a Dry Stack
The February 2019 technical report on Coeur's Silvertip property in British Columbia describes a 1,000 t/d plant with a jaw
The February 2019 technical report on Coeur's Silvertip property in British Columbia describes a 1,000 t/d plant with a jaw
Cameco's November 2026 technical report replaces the 2019 report written during the shutdown, raising the slurry cut to 3.5% U3O8
Agnico Eagle's February 2015 updated technical report on Meliadine describes a heated plant building with a 3,000 tpd start and
The March 2016 preliminary economic assessment for the Cape Ray gold property in Newfoundland and Labrador describes a conceptual plant
Crocodile Gold's July 2013 technical report on the Burnside project describes the Union Reefs gold plant, with 2.5 Mtpa capacity,
The 2011 preliminary economic assessment for the Burgin extension deposit in the East Tintic district describes refurbishing a 1968 mill,
The December 2017 preliminary economic assessment for Meridian Mining's Bom Futuro project in Rondônia, Brazil describes a 500 t/h plant
The 2013 independent report on the Bokoni platinum mine in Mpumalanga, South Africa describes a shared crushing circuit, a Merensky
The September 2020 feasibility study for Orca Gold's Block 14 project in Sudan describes a gyratory crusher, grinding at 53
The 2015 resource update for Golden Band's Bingo deposit includes a brief description of the Jolu Mill circuit used while