Boumadine Polymetallic Project — 2022 Technical Report
This technical report outlines the process plant design for the Boumadine Polymetallic Project, operated by Aya Gold & Silver Inc. The facility is designed to recover lead, zinc, and pyrite concentrates from polymetallic sulphide ore. The process flowsheet is based on conventional flotation technology, optimized to minimize operating costs while maximizing the use of proven equipment. The plant is designed for a nominal throughput of 2.92 million tonnes per annum (Mtpa) over a mine life of 11 years.
Boumadine Polymetallic Project — 2022 Technical Report Read Post »





