Doropo 2024 Feasibility Study Designs a 4.0 Mt/a SAG-Ball, Gravity, Leach-CIL and Pressure Zadra Plant That Runs at 5.4 Mt/a on Oxide Feed
This National Instrument 43-101 Technical Report presents the Pre-feasibility Study for the Doropo Gold Project in West Africa. The proposed process plant design is based on a robust metallurgical flowsheet designed for optimum recovery with minimum operating costs. The flowsheet utilizes unit operations that are well proven in industry, with equipment selection criteria focusing on suitability for duty, projected mine life, reliability, and ease of maintenance. The plant layout is designed to provide ease of access for operating and maintenance requirements while maintaining a compact footprint to minimize construction costs.








