Red Dog Mine — 2016 Technical Report
The Red Dog processing plant uses three stages of grinding and froth flotation to recover sphalerite and galena as separate
Red Dog Mine — 2016 Technical Report Read Post »
The Red Dog processing plant uses three stages of grinding and froth flotation to recover sphalerite and galena as separate
Red Dog Mine — 2016 Technical Report Read Post »
The 2019 technical report describes the existing New Liberty processing facility, its historical operating performance from 2017 to early 2019,
New Liberty Gold Mine — 2019 Technical Report Read Post »
This report describes the conventional sulphide flotation processing route at Perkoa Mine, the associated historical plant performance from 2013 to
Perkoa Mine — 2018 Technical Report Read Post »
This technical report describes the proposed processing route for pregnant leach solution from in-situ copper recovery to produce LME grade
Van Dyke Copper Project — 2020 Technical Report Read Post »
Stawell Gold Mines — 2015 Technical Report Company Newmarket Gold Mine Stawell Gold Mines Date 2015 Region Stawell, Australia Commodities
Stawell Gold Mines — 2015 Technical Report Read Post »
The Kurmuk Gold Project proposes a conventional carbon-in-leach processing plant designed to treat 5 Mt/a of oxide ore and 4
NI 43-101 Technical Report for the Kurmuk Gold Project, Ethiopia Read Post »
This Preliminary Economic Assessment report describes the proposed mineral processing route for the Uatnan Mining Project, based on historical testwork
Uatnan Mining Project — 2023 Technical Report Read Post »
The Diablillos Project is a gold-silver mineralized material processing operation designed to treat up to 9,000 metric tons per day
Diablillos Project — 2025 Technical Report Read Post »
The report presents a designed processing plant using conventional differential flotation to produce copper, lead, and zinc concentrates from the
Tulsequah Chief Project – Feasibility Study Technical Report Read Post »
This article details the proposed mineral processing route for the Alpala copper-gold-silver deposit, based on the Preliminary Economic Assessment (PEA)
Cascabel Project — Alpala Copper-Gold-Silver Deposit Read Post »