Wa Gold Project — 2012 Technical Report
This report presents the mineral processing and metallurgical testing programme for the Wa Gold Project in Ghana. Report context The
Wa Gold Project — 2012 Technical Report Read Post »
This report presents the mineral processing and metallurgical testing programme for the Wa Gold Project in Ghana. Report context The
Wa Gold Project — 2012 Technical Report Read Post »
Ixtaca — PEA Update Recovery Methods Company Almaden Minerals Ltd. Commodities Gold, Silver Throughput 7,500 tpd Status PEA Update Executive
Ixtaca — PEA Update Recovery Methods Read Post »
This report details the proposed two-part recovery process, comprising a concentrator near the Rubicon and Helikon mines and a chemical
Desert Lion Energy Inc. — 2018 Technical Report Read Post »
The Fruta del Norte process plant uses a conventional gravity-flotation-cyanidation flowsheet to treat underground ore, with reported gold recovery of
Fruta del Norte Mine — 2023 Technical Report Read Post »
This technical report summarizes the mineral processing and metallurgical testing programs for the Rosebel Gold Mine in Suriname, with an
Technical Report on the Rosebel Gold Mine Read Post »
This report presents the mineral processing and metallurgical testing framework for the Cigar Lake operation, including flowsheet design and testwork
2024 Cigar Lake Technical Report Read Post »
Westgold's October 2026 reports describe two plants for Beta Hunt ore: its own 1.6 Mtpa Higginsville CIL mill, the subject
Lydian's 2019 feasibility study for the Amulsar gold project in Armenia keeps the 2017 flowsheet, with most major equipment already
The Moa Project, operated by Sherritt International, is a nickel and cobalt mining and processing operation located in Moa, Cuba. The project utilizes a hydrometallurgical processing route, specifically High Pressure Acid Leaching (HPAL), to treat limonitic laterite ore. The process involves slurry preparation, pressure acid leaching, counter-current decantation, and sulphide precipitation to produce a mixed sulphide intermediate product. This intermediate is then transported to the Cobalt Refinery Company (CRC) in Fort Saskatchewan, Canada, for further refining into commercial pure nickel and cobalt metal products.
Moa Project — 2023 Technical Report Read Post »
This section of the NI 43-101 Technical Report details the recovery methods for the Catanava Gold Property. The process begins with gravimetric concentration, where ore is transported by truck to a discharge area and deposited into a coarse ore bin with a capacity of approximately 100 tonnes. The ore undergoes primary crushing via a jaw crusher, reducing the size to one inch, followed by secondary crushing in a cone crusher to achieve a size of 1/8 inch.
Catanava Gold Property — 2011 Technical Report Read Post »