Duncan Lake PEA Plans a 113,000 t/d Magnetite Concentrator With Three SAG Mills and a 135 km Slurry Pipeline to a James Bay Pellet Plant
This NI 43-101 Technical Report outlines the mineral resources of the Duncan Lake Iron Project as of October 2012. The report details the proposed recovery methods based on test work conducted at SGS Lakefield. The project is currently in the development phase, with the finalized flowsheet intended for inclusion in a Preliminary Economical Assessment report.






