Mineral Processing Circuit

Old Nic Mine — 2012 Technical Report

The Old Nic Mine processing plant is designed to achieve an overall gold recovery rate of 90%, utilizing a combination of gravity concentration and carbon-in-pulp (CIP) leaching. Approximately 70% of the gold is recovered as free gold in gravity concentrators, specifically Knelson concentrators and James Tables, while the remaining gold is processed through a conventional CIP circuit. This hybrid approach targets the high proportion of free-milling gold (60-70%) found in the Old Nic ore.

Old Nic Mine — 2012 Technical Report Read Post »

A block flow diagram of the LHU process plant is presented in Figure 17.1.

Langer Heinrich Uranium Project — 2024 Technical Report

This NI 43-101 Technical Report details the processing facility and operational status of the Langer Heinrich Uranium Project (LHU) in Namibia, operated by Paladin Energy Limited. The facility was historically operational until 2018 and is currently undergoing a Restart Project to resume production. The report outlines the beneficiation and hydrometallurgical circuits, including ore handling, scrubbing, classification, leaching, ion exchange, and precipitation processes. Historical data from 2014 to 2018 indicates uranium recoveries generally above 80%, with recent years achieving 85-90%.

Langer Heinrich Uranium Project — 2024 Technical Report Read Post »

Figure 17-2: Simplified Process Flow Sheet

Great Atlantic Salt Project — 2025 Technical Report

This NI 43-101 Technical Report details the recovery methods and processing plan for the Great Atlantic Salt Project, operated by Atlas Salt Inc. The project involves underground mining of salt deposits to produce de-icing salt conforming to ASTM D632-12 specifications. The processing plant is designed to operate underground, utilizing conventional dry screening and crushing methods to achieve a maximum annual production rate of 4.0 million tonnes per annum (Mtpa). The facility includes a 190 m long processing area located at the bottom of a conveyor incline tunnel, equipped with double roll crushers and inclined vibrating screens.

Great Atlantic Salt Project — 2025 Technical Report Read Post »

Holt Mine — NI 43-101 Technical Report

This technical report details the recovery methods and process plant operations at the Holt Mine. The Holt Mill, constructed in 1988, has undergone expansions to reach a current throughput capacity of 3,000 tonnes per day. The facility utilizes a grinding circuit comprising a converted SAG mill, a ball mill, and a tertiary ball mill, followed by a Carbon-in-Leach (CIL) circuit for gold recovery.

Holt Mine — NI 43-101 Technical Report Read Post »

Hannukainen process flowsheet: Hannukainen Block Flowsheet (courtesy of Jacobs)

Hannukainen Technical Report — 2014

This section of the 2014 Hannukainen Technical Report details the metallurgical testwork and process plant design for the Hannukainen project. The ore bodies, including Laurinoja, Kuervaara, and Vuopio, contain magnetite and chalcopyrite with associated gold. Metallurgical testing conducted by SGS and GTK between 2007 and 2013 established a flowsheet involving primary AG/SAG grinding, copper flotation, magnetic separation, and pyrite/pyrrhotite flotation. The plant is designed for 6.5 Mtpa throughput at Rautuvaara, producing magnetite concentrate (68% Fe) and copper concentrate (25% Cu).

Hannukainen Technical Report — 2014 Read Post »

Xtierra_Project process flowsheet: Simplified Process Flow Diagram

2014 Technical Report — Xtierra Inc.

This technical report details the recovery methods and mineral processing plant design for a silver-lead-zinc sulphide ore project developed by Xtierra Inc. The facility is designed for a throughput rate of 2,000 tonnes per day (tpd). The processing circuit is engineered to produce separate lead-silver and zinc concentrates for off-site transport, utilizing a comprehensive flow of crushing, grinding, and flotation operations.

2014 Technical Report — Xtierra Inc. Read Post »

Da Tambuk Project process flowsheet: Simplified Process Flowsheet

Da Tambuk Project — Technical Report

This Technical Report and Preliminary Economic Assessment outlines the proposed recovery methods for the Da Tambuk Project located in the Adyabo Property, Tigray National Regional State, Ethiopia. The project involves an underground mining operation targeting gold-silver bearing material. The proposed processing facility is designed to treat material at a nominal rate of 550 tonnes per day (200,000 tonnes per annum) using whole mill feed cyanide leach technology. The process integrates conventional crushing, ball mill grinding, gravity concentration, and a six-stage Carbon-in-Leach (CIL) circuit to recover gold and silver into a doré product.

Da Tambuk Project — Technical Report Read Post »

Cabaçal Feasibility Study Starts at 2.5 Mt/a With SAG Milling, Gravity, Jameson Cleaners and Pyrite Flotation, Then Expands to 4.5 Mt/a

Meridian Mining’s 2026 definitive feasibility study replaces the 2023 PEA concept with a staged gold-copper concentrator in Mato Grosso, adding a pyrite flotation step that separates high-sulphide tailings from low-sulphide tailings before filtration and dry stacking.

Cabaçal Feasibility Study Starts at 2.5 Mt/a With SAG Milling, Gravity, Jameson Cleaners and Pyrite Flotation, Then Expands to 4.5 Mt/a Read Post »