The September 2013 Updated Indicated Definitive Project (IDP) report for the Madaouela project, prepared by SRK Consulting for GoviEx, outlines the technical and economic basis for processing uranium ore from the Marianne and Marilyn deposits in Niger. The study evaluates three alternative treatment flowsheets, ultimately selecting Option 1B as the base case. This option incorporates crushing, radiometric ore sorting (ROS), wet milling, ablation, two-stage acid tank leaching, and enhanced solvent extraction using Cyanex 600. The design throughput is 4,020 tonnes per day, targeting a uranium production of approximately 2.24 million pounds of U3O8 annually.