Kiniero Gold Project — 2024 Technical Report
The Kiniero Gold Project in Guinea is currently in the development phase, with a Technical Report completed in 2024 by Primero. The project is designed to process a blend of saprolite, laterite, transition, and fresh ores from open pit mining operations. The proposed process plant features a flexible metallurgical flowsheet capable of handling varying ore types while maintaining a nominal throughput of 5.0 Mtpa, with capacity to treat up to 6.0 Mtpa on high-oxide feed blends.
Kiniero Gold Project — 2024 Technical Report Read Post »






