Executive Summary

This NI 43-101 Technical Report, prepared by JDS Energy & Mining Inc. for Mountain Province Diamonds Inc. and De Beers Group, provides an update to the mineral resources and mineral reserves at the Gahcho Kué Mine as of December 31, 2019. The mine is operated through the Gahcho Kué Joint Venture (GKJV) and is located in the Northwest Territories, Canada. The report details the geological setting of the kimberlite pipes (5034, Hearne, and Tuzo), the mining methods employed, and the processing plant capabilities.

The mineral resource estimate includes indicated and inferred categories, with a total of 15.8 million tonnes containing 22.1 million carats. Mineral reserves are classified as probable, totaling 33.0 million tonnes containing 53.0 million carats. The processing plant treats kimberlite ore via crushing, screening, dense media separation, and x-ray sorting to produce a diamond-rich concentrate.

The mine is currently in the operating phase, with production commencing in 2016 and expected to continue until mid-2030. Infrastructure includes an all-weather airstrip and winter road access due to the remote northern location. Environmental and socioeconomic agreements are in place with the Government of the Northwest Territories and Indigenous groups.

Reports

Processing Profile

Website: https://www.mountainprovince.com/

Report Date: 2019-12-31

Region: Northwest Territories, Canada

Project Status: Operating

Commodity: Diamonds

Throughput: 3.23 – 3.35 Mtpa

Mine Life: 2014 – 2030

Mine Type: Open Pit

Ore type:

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Gahcho Kué Mine — 2018 Technical Report

Gahcho Kué Mine — 2018 Technical Report

Company De Beers
Date 2018
Region Northwest Territories, Canada
Commodities Diamonds

Executive Summary

This NI 43-101 Technical Report details the recovery methods and processing facilities for the Gahcho Kué Mine, a diamond operation located in the Northwest Territories, Canada. The mine extracts kimberlite ore from four distinct pipes (5034, Hearne, Tuzo, and Wilson) and processes it through a plant designed for 3.6 Mt/a throughput. Commercial production commenced in Q1 2017, with ongoing improvements aimed at maximizing plant capacity and efficiency.

The processing plant utilizes a combination of crushing, screening, dense media separation (DMS), and X-ray sorting to recover diamonds in the 1.1 to 28 mm size range. The ore is treated via HPGR and cone crushing, followed by DMS modules using FeSi medium. The resulting diamond-rich concentrate is sent to Yellowknife for final cleaning and valuation. Tailings are managed as Coarse Processed Kimberlite (CPK) and Fine Processed Kimberlite (FPK), with specific containment strategies for each stream to ensure environmental compliance.

Reports

  • entities/Gahcho_Kue_Mine

Website: https://www.debeersgroup.com/our-business/exploration-and-mining

Report Date: 2018

Region: Northwest Territories, Canada

Project Status:

Commodity: Diamonds

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Gahcho Kué Mine Technical Report

Gahcho Kué Mine Technical Report

Company Mountain Province Diamonds Inc. (49%), De Beers Group (51%)
Date 2017
Commodities Diamonds
Mine Type Open Pit
Status Operating

Executive Summary

The Gahcho Kué Mine is a diamond mine located at Kennady Lake, approximately 300 km east-northeast of Yellowknife in the Northwest Territories, Canada. The mine extracts kimberlite resources from three different deposits: 5034, Hearne, and Tuzo. The mine commenced commissioning in September 2016 and declared commercial production in March 2017. The mine is operated through the Gahcho Kué Joint Venture (GKJV) agreement between Mountain Province Diamonds Inc. (49%) and De Beers Group of Companies (51%). The processing plant targets recovery of liberated diamonds in the 1 to 28 mm size range and is designed for efficient diamond recovery over the plant’s 12-year life. The mine expects approximately 550 permanent jobs during the 12-year operational phase.

Key Details

  • Location: Kennady Lake, Northwest Territories, Canada (63°26.16N, 109°12.05W)
  • Mine Life: 12 years
  • Annual Ore Treatment: ~3.1 Mt per year
  • Deposits: 5034, Hearne, Tuzo kimberlite pipes
  • Processing: Crushing, screening, dense media separation (DMS), x-ray sorting
  • Recovery Size Range: 1 to 28 mm diamonds

Reports

Website: https://www.debeersgroup.com/our-business/exploration-and-mining

Report Date: 2017

Region: 

Project Status: Operating

Commodity: Diamonds

Throughput: 

Mine Life: 

Mine Type: Open Pit

Ore type:

Mineral processing basics

Scroll to Top