| Company | Unknown |
| Mine | Los Verdes |
| Date | Unknown |
| Region | Unknown |
| Commodities | Unknown |
Executive Summary
The Los Verdes mine project is designed to utilize conventional truck-shovel open pit mining techniques. Operations are planned for a 21-hour per day, 6 days per week schedule, targeting a nominal production rate of approximately 3500 tonnes per day. The mining method involves drilling and blasting mineralised material on 5-meter high benches using a staggered blast hole pattern, while waste will be drilled on 10-meter high benches with wider spacing.
All blasting activities will be conducted using bulk ANFO (ammonium nitrate/fuel oil) explosives. Primary loading will be performed by hydraulic excavators paired with articulated haul trucks. The mineralised material will be hauled approximately 1.5 km to the main processing plant location. A preliminary waste storage location has been identified approximately 1.5 km southwest of the open pit area. It is assumed that all mining operations will be performed and directly supervised by a capable Mexican mining contractor.
Website: https://www.jiosaavn.com/song/los-verdes-stoner-institute-mix/AQcgWUVbA18
Report Date: Unknown
Region: Unknown
Project Status:
Commodity: Unknown
Throughput:
Mine Life:
Mine Type:
Ore type:

