The Madsen Mine in Ontario, Canada, operates a sophisticated gold processing plant capable of achieving 95.7% gold recovery through a combination of gravity concentration, cyanide leaching, and carbon adsorption. The facility processes 800 tonnes per day (tpd) of ore from five distinct lenses, delivering gold doré bars on-site.

Key Process Stages

  • Primary Crushing: Semi-mobile jaw crusher reduces ROM feed (F100: 500 mm) to P80 of 75 mm
  • Grinding: SAG mill (4.9m x 1.5m, 560 kW) and ball mill (2.9m x 4.9m, 560 kW) achieve final P80 of 75 µm
  • Gravity Concentration: Two semi-continuous concentrators recover free gold from SAG/ball mill discharge
  • Pre-Oxidation: Oxygen-sparged agitation tank (2-hour retention) optimizes leaching conditions
  • Cyanide Leaching: Five tanks (24-hour retention) operate at 150-170 ppm NaCN and pH 11.0
  • CIP Adsorption: Six-tank circuit (5-hour retention) with carbon concentration of 25-50 g/L
  • Carbon Processing: Acid wash (3% HCl), pressurized elution (140°C, 450 kPa), and thermal regeneration
  • Electrowinning: Dual-circuit system processes strip solution and intensive leach concentrate
  • Cyanide Destruction: SO2/oxygen process reduces CNWAD to <5 mg/L in agitated tanks

Critical Data

Parameter Value Source
Throughput 800 tpd SRK Mine Plan
Gold Recovery 95.7% BaseMet Testwork (BL288)
Bond Ball Mill Work Index 9.7-17.1 kWh/t BaseMet (2018, 2023)
Leach Retention Time 24 hours Operational Data
CIP Carbon Load 3,310 g Au/t Vendor Model
NaCN Consumption 152 t/yr BaseMet (2018)

Innovations

The plant features oxygen injection in pre-oxidation and leach circuits to enhance metallurgical performance, along with a hydraulic backfill system for tailings management starting in Year 1. The carbon regeneration kiln processes 1 tpd of activated carbon with integrated heat recovery.