Mangueiros Project — NI 43-101 Technical Report

Company: DR/BP (Mangueiros)
Consultant: SRK Consulting (U.S.), Inc.
Date: January 2026
Report Type: NI 43-101 Technical Report

Executive Summary

This NI 43-101 Technical Report covers the Mangueiros Project, an exploration-stage project. The report addresses the current exploration target status and identifies areas requiring additional work. Section 17 (Recovery Methods) is noted as not applicable to the current exploration target, as further work is required to detail the proposed recovery methods and requirements. The project is being advanced by DR/BP with technical support from SRK Consulting (U.S.), Inc. As an exploration project, no operational details such as production rates, processing methods, or mine life estimates are currently available.

Key Findings

  • Status: Exploration Target
  • Recovery Methods: Not yet applicable; further work required
  • Report Date: January 2026
  • Consultant: SRK Consulting (U.S.), Inc.

References

  • DR/BP Mangueiros_NI43101_Report_USPR002011_Rev07.docx

Website: https://www.bahiametals.com/mangueiros-project

Report Date: 

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top