Platreef 2022 Feasibility Study

Company Ivanhoe Mines Ltd.
Date 2022
Region Limpopo Province, South Africa
Commodities Platinum, Palladium, Rhodium, Gold, Nickel, Copper
Mine Type Underground
Throughput 0.77 Mtpa (Phase 1), 5.2 Mtpa (Steady State)
Mine Life 29 years
Status Development

Executive Summary

The Platreef 2022 Feasibility Study outlines a phased development plan for the Platreef Project, located in the Limpopo Province of South Africa. The project involves the construction of a large-scale, mechanized underground mine accessed via two vertical shafts, with a processing plant designed to treat Run-of-Mine (RoM) material. The plan initiates with a concentrator plant throughput of 0.77 Mtpa in Phase 1, ramping up to a steady-state production rate of 5.2 Mtpa through the addition of modular concentrator streams in Phase 2.

Metallurgical testwork supports a conventional three-stage crushing and ball milling circuit followed by flotation and dewatering stages. A significant change from the 2017 Feasibility Study is the adoption of a dry-stack tailings facility to enhance water efficiency and safety. The project targets an average annual production of 522,379 oz of 3PE+Au, plus 23 Mlb of nickel and 14 Mlb of copper, with an after-tax NPV8% of $1.69 billion and an IRR of 18.5%.

Processing Profile

  • Crushing: Three-stage crushing circuit (Primary, Secondary, Tertiary). HPGR considered for Phase 2.
  • Milling: Single-stage ball milling circuit.
  • Flotation: Rougher, Cleaner, and Scavenger circuits. Split cleaner configuration.
  • Tailings: Dry stack deposition methodology.

Website: https://www.ivanhoemines.com/what-we-do/operations-projects/platreef-development-project/

Report Date: 2022

Region: Limpopo Province, South Africa

Project Status: Development

Commodity: Platinum, Palladium, Rhodium, Gold, Nickel, Copper

Throughput: 0.77 Mtpa (Phase 1), 5.2 Mtpa (Steady State)

Mine Life: 29 years

Mine Type: Underground

Ore type: 