Point Rousse Project — 2020 Technical Report

Figure 85: Process Flow Sheet for the Pine Cove Milling Operation.

This technical report provides a Mineral Resource and Mineral Reserve update for the Point Rousse Project, including the Pine Cove Mine, Stog’er Tight Deposit, and Argyle Deposit, with an effective date of August 4, 2020.

Report context

The Point Rousse Project is located within the Baie Verte Mining District, on the Point Rousse/Ming’s Bight Peninsula, approximately 6 km northeast of the town of Baie Verte, in north central Newfoundland, Canada. This NI 43-101 technical report, published September 18, 2020, with an effective date of August 4, 2020, provides a Mineral Resource and Mineral Reserve update for Anaconda Mining Inc.’s Point Rousse Project. All currencies in this report are reported in Canadian dollars unless otherwise specified. The project area includes six mining leases and seven mineral licences with a total of 5,552 hectares. All mining leases and mineral licences are in good standing with the Government of Newfoundland and Labrador.

Processing route

Pine Cove Mill and Processing

The Pine Cove mill is the central processing facility for the Point Rousse Project. The report includes a process flow sheet for the Pine Cove milling operation and a mill recovery flow sheet. Mill components are identified, and yearly mill statistics are reported for fiscal years 2012 through 2019.

Stog’er Tight Processing

The report provides a summary of Stog’er Tight processing for 2018 and 2019, representing historical operating data from that deposit.

Argyle Metallurgical Testwork

Metallurgical testing for the Argyle Deposit included head analysis on an Argyle sample and liberation flotation test work. The report documents a liberation flotation test workflow sheet, liberation flotation operating conditions, cumulative results for Argyle flotation test work per grind, and a summarized mass balance of the flotation test work from 2015. These are testwork results and do not represent confirmed operational performance.

Key reported parameters

Parameter Value Unit Basis
Probable Mineral Reserve (total) 706,443 tonnes Design
Average diluted grade (total) 1.90 g/t Au Design
Contained gold (total) 43,183 ounces Design
Pine Cove Mine Pit & ROM stockpile Probable Reserve 170,851 tonnes Design
Average diluted grade (Pine Cove) 1.40 g/t Au Design
Argyle Deposit Probable Reserve 535,592 tonnes Design
Average diluted grade (Argyle) 2.06 g/t Au Design
Contained gold (Argyle) 35,477 ounces Design
Combined Indicated Mineral Resource 1,470,000 tonnes Estimate
Average grade (Indicated) 2.34 g/t Au Estimate
Contained gold (Indicated) 110,800 ounces Estimate
Combined Inferred Mineral Resource 515,000 tonnes Estimate
Average grade (Inferred) 3.33 g/t Au Estimate
Contained gold (Inferred) 55,100 ounces Estimate
Yearly mill throughput (fiscal 2012–2019) Reported tonnes per year Historical operating data
Argyle flotation test work Per grind results % recovery Testwork
Gold price assumption (base case) $1,900 (US$1,425) CAD$/oz Design

Technical qualifications

The report contains forward-looking information based on opinions and estimates of management. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The report states that the Company does not anticipate paying on the Net Profits Interest in the next year. The report does not provide a confirmed flowsheet for the Argyle Deposit; metallurgical results are based on testwork only. Historical operating data for Stog’er Tight processing is presented for 2018 and 2019 only. The report does not specify whether the Pine Cove mill can process Argyle ore at design capacity without modification.

Source: NI 43-101 Technical Report, Mineral Resource and Mineral Reserve Update on the Point Rousse Project, Baie Verte, Newfoundland and Labrador, Canada, effective date August 4, 2020, published September 18, 2020, Sections 1.0, 13.0, 14.0, 15.0, 17.0.