This article summarizes the processing route and key parameters reported in the NI 43-101 Technical Report for the Corcoran Canyon Project.
Report context
The NI 43-101 Technical Report for the Corcoran Canyon Project, Nye County, Nevada, was prepared for Resource Capital Gold Corp. with an effective date of July 15, 2016, and an issue date of August 8, 2016. The report covers property description, geology, history, exploration, drilling, sample preparation, data verification, mineral resource estimates, and recommendations. The report does not present a preliminary economic assessment, and no processing flowsheet, operating data, or testwork results are included in the available evidence.
Processing route
Mineral Resource Estimates
The report contains a section titled Mineral Resource Estimates (Section 13). No details on resource classification, tonnage, grade, or cutoff parameters are provided in the available evidence.
Metallurgical Testing
The report recommendations include a Phase 2 item for Metallurgical Testing. No testwork results, design parameters, or historical operating data are presented in the available evidence.
Recommendations
The report recommends Phase 1: Drilling and Resource Calculation and Phase 2: Metallurgical Testing, with an associated budget. No flowsheet design, processing performance, or economic parameters are included.
Key reported parameters
| Parameter | Value | Basis |
|---|---|---|
| Effective Date | July 15, 2016 | Report date |
| Issue Date | August 8, 2016 | Report date |
| Property | Corcoran Canyon Project | Report location |
| County | Nye County, Nevada | Report location |
| Company | Resource Capital Gold Corp. | Report preparer |
| Phase 1 Recommendation | Drilling and Resource Calculation | Report recommendation |
| Phase 2 Recommendation | Metallurgical Testing | Report recommendation |
Project website: https://www.mining.com/web/ressources-appalaches-acquisition-and-development-at-the-dufferin-mine/
Technical qualifications
The report does not contain a preliminary economic assessment, processing flowsheet, design parameters, historical operating data, testwork results, or economic analysis. No mineral resource estimates are reported in the available evidence. The report is a technical report under NI 43-101 and is limited to property description, geology, exploration history, drilling, and recommendations for future work.
Source: NI 43-101 Technical Report, Corcoran Canyon Project, Nye County, Nevada, effective July 15, 2016, issued August 8, 2016.