Executive Summary
This section of the technical report addresses the assumed recovery methods for the Yandera Copper Project. It is proposed that a mill would be utilized to process both oxide and sulfide material, employing flotation recovery techniques. This assumption covers the general metallurgical approach required for the project’s ore types.
However, the report explicitly states that no work has been conducted to quantify the costs associated with these methods or to identify any fatal flaws. Due to the lack of detailed analysis and cost estimation, a comprehensive discussion on recovery methods is not included in this specific report update. The information provided remains preliminary and indicative of potential processing routes rather than finalized engineering designs.
Operational Details
Processing Profile
Reports
Website: https://www.juniorminingnetwork.com/junior-miner-news/3164-static/stock-lists/123589-gold-mining-stocks.html
Report Date: February 2017
Region: Not Specified
Project Status: Exploration
Commodity: Copper
Throughput: Not Specified
Mine Life: Not Specified
Mine Type: Not Specified
Ore type:
Technical report and processing history
The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.
Yandera Project — Technical Report
Yandera Project — Technical Report
| Company | Yandera Project |
| Date | Unknown |
| Region | Madang, Papua New Guinea |
| Commodities | Copper, Molybdenum, Gold, Silver, Magnetite |
| Mine Type | Unknown |
| Throughput | 25 Mtpa |
| Annual Production | 230,000 tpa Cu, 2,300 tpa Mo, 200,000 tpa Magnetite |
| Status | Development |
Executive Summary
This section of the technical report outlines the preliminary recovery methods for the Yandera Project, based on ongoing metallurgical testwork. The proposed process plant is designed to handle an annual feed rate of 25 million tonnes, targeting the recovery of copper, molybdenum, gold, silver, and magnetite from hypogene feed types. The flowsheet includes primary crushing, semi-autogenous grinding, and a complex flotation and magnetic separation circuit to produce distinct concentrates.
The processing circuit begins with a 60-inch gyratory crusher feeding a coarse ore stockpile, followed by twin parallel SAG milling circuits to achieve a P80 grind size of 150 µm. Flotation trains are utilized for bulk rougher-scavenger recovery, followed by specific cleaning circuits for copper and molybdenum separation. Magnetite is recovered from flotation tails via low-intensity magnetic separation and reverse flotation.
Concentrates are managed through thickening and filtration. Copper and magnetite concentrates are pumped via pipeline to a storage and shiploading facility at Madang, while molybdenum concentrate is bagged and transported by road to Lae. Tailings are thickened and disposed of in an integrated facility. The design remains preliminary and subject to modification based on further testwork.
Reports
Website: https://freeportresources.com/yandera-project/yandera-copper/
Report Date: Unknown
Region: Madang, Papua New Guinea
Project Status: Development
Commodity: Copper, Molybdenum, Gold, Silver, Magnetite
Throughput: 25 Mtpa
Mine Life:
Mine Type: Unknown
Ore type: