| Company | EastCoal Inc |
| Mine | Verticalnaya Coal Mine |
| Date | September 2013 |
| Region | Not Specified |
| Commodities | Anthracite |
| Status | Development |
Executive Summary
This section of the NI 43-101 Technical Report outlines the recovery methods for the Verticalnaya Coal Mine, specifically focusing on seams H 11B and H 8. The processing plant is designed to handle high-density anthracite using magnetite-based dense medium systems to achieve a separating density between 1,900 kg/m³ and 2,000 kg/m³. The facility is planned in two phases to align with production ramp-up, with a capacity to process 350 tons per hour of feed.
The plant design emphasizes flexibility to manage volatile and seasonal markets, including stockpiling capabilities and dry screening of fines. Operational metrics project energy requirements of 5 to 6 kWh per ton and water usage of 80 litres per ton. Production is expected to ramp up from 2013 through 2029, with a total projected clean production of approximately 26.7 million tonnes.
Processing Profile
Reports
Website: https://www.biv.com/news/resources-agriculture/eastcoal-buys-ukrainian-coal-mine-8233489
Report Date: September 2013
Region: Not Specified
Project Status: Development
Commodity: Anthracite
Throughput:
Mine Life:
Mine Type:
Ore type: