Gold Recovery Methods at Serabi’s Palito Complex Plant

Figure 17-1: Serabi Process Plant Flowsheet

Source: Serabi Gold plc (2026)
Website: https://www.serabigold.com/operations/palito-complex/

Critical Data

Parameter Value Unit Notes
Throughput 500 tpd Plant design capacity
Mill Power (Ball Mill 01) 253.6 kW Humboldt Wedag 2.3m x 3.2m; Palito circuit
Target Grind Size 120 µm P80 for all grinding circuits
Head Grade 6.80 g/t 2025 milled ore feed grade
Recovery % 96.7 % 2025 overall gold recovery for milled ore
Processing Capacity 500 tpd Consistent with plant throughput
Energy Consumption N/A kWh/t Not specified in source document
Water Consumption N/A m³/t Not specified in source document
Operating Hours 24 hours/day Continuous operation inferred from process description

Overview

Serabi Gold plc operates a 500 tonnes-per-day (t/d) gold processing facility at the Palito Complex, located in Pará State, Brazil. The plant processes ore from both the Palito and São Chico mines using an integrated flowsheet that combines crushing, grinding, ore sorting, copper flotation, carbon-in-pulp (CIP) cyanidation, intensive leaching, elution, electrowinning, and smelting to produce doré bars. Established well before the effective date of the 2026 NI 43-101 Technical Report, the plant has been operating continuously with consistent performance. Its significance lies in the ability to treat two different ore types efficiently: Palito ore undergoes copper flotation to recover a high-grade copper concentrate carrying 50–70% of the gold, while the flotation tailings report to CIP cyanidation for residual gold and silver recovery. São Chico ore feeds a separate grinding circuit with gravity concentration and intensive cyanide leaching of the concentrate. The combination of ore sorting for low-grade material, selective flotation, and cyanidation ensures a high overall gold recovery, which reached 96.7% in 2025. The facility also processes historical flotation tailings, achieving an average recovery of 77.0% from those stockpiles. The entire process is designed to maximize gold extraction while producing a marketable copper concentrate and a final doré product shipped offsite for refining.

Key Process Stages

  • Stage 1: Crushing – ROM ore is crushed to minus 15 mm using a primary jaw crusher (Metso 6240E, 56 kW), secondary (Faço 60S) and tertiary cone crushers (Faço 60TF and Sandvik H2800) in closed circuit with a double-deck vibrating screen (Simplex SXP 4015/2D). Oversize (+38 mm) returns to secondary crushing; intermediate fraction (-38+15 mm) low-grade material is diverted to the ore sorter. Final product P80 is 12–15 mm at an average feed rate of 35 t/h.
  • Stage 2: Ore Sorting – Low-grade Palito ore (-38+15 mm) is upgraded using a Comex CXR-1000 X-ray/optical sorter. Material is washed over an 8 mm screen before being presented as a single layer on a high-speed conveyor. Each particle is scanned by photometric color and XRT sensors; a computer algorithm classifies particles and directs air jets to separate product from waste. The sorted product (9.79 g/t average grade) is returned to the crushing circuit, while waste (0.64 g/t) is stockpiled. Commissioned in 2020, the sorter has processed 163,207 tonnes of feed through 2025.
  • Stage 3: Grinding and Gravity Concentration – Three parallel ball mill circuits grind ore to 80% passing 120 µm. Circuit 1 (Humboldt Wedag 2.3×3.2 m, 253.6 kW) processes Palito ore for flotation. Circuit 2 (Zanini 2.2×3.5 m, 205.2 kW) grinds São Chico ore and includes a Falcon SB-750B centrifugal concentrator (7.5 kW) to recover free gold. Circuit 3 (Zanini 2.2×3.5 m, 205.2 kW) can treat either ore type. Cyclone overflow from Palito circuits reports to flotation; São Chico overflow combines with flotation tailings for CIP.
  • Stage 4: Intensive Leaching & Copper Flotation – São Chico gravity concentrate is leached in a Gekko In-line Leach Reactor (ILR150) in 800 kg batches using 1.5% NaCN and hydrogen peroxide for 24 hours. The leach solution is circulated through an electrowinning cell (600×600 mm, 25.4 kW) in the gold room. Palito ore undergoes flotation in a conditioning tank followed by rougher, scavenger, and cleaner cells (Emprotec dual cells, 22.8–22.4 kW each). Collector A3894 and lime (pH 10–11) are used. Rougher concentrate ( >20% Cu) is filtered via an Andritz filter press; scavenger tails go to CIP. Flotation recovery captures 50–70% of the gold in Palito ore into a copper concentrate shipped offsite.
  • Stage 5: CIP Cyanidation, Elution & Gold Refining – Flotation tailings and São Chico gravity tails are combined in two leach tanks (185 m³ each) and six adsorption tanks (74 m³ each) providing ~18 hours retention at 35% solids. Cyanide is maintained at 250 ppm NaCN in leach, attenuating to ~100 ppm. Carbon concentration is 20 g/L (40 g/L in first tank). Loaded carbon is acid washed with 2% HCl, then eluted at 130°C using the Zadra process (1.5 t capacity column). Pregnant solution passes through electrowinning cells (Como Eng, 25.4 kW each). Gold/silver sludge is dried, fluxed, and smelted in a Grion 11 L furnace at 1,200°C to produce doré bars. Each elution cycle averages 15 hours. Barren carbon is regenerated at 750°C in a Kemix kiln (75 kg/h) before returning to the circuit.

Additional Interesting Data and Summary

The Palito processing plant demonstrated robust operating performance from 2014 to 2025, processing over 2 million tonnes of milled ore with an average head grade of 6.80 g/t and a consistent gold recovery of 92.0% for milled ore. In 2025 alone, 208,999 tonnes of ore at 6.80 g/t yielded 44,169 ounces of gold at a record recovery of 96.7%. The plant also processed 139,411 tonnes of historical flotation tailings between 2015 and 2023, achieving an average recovery of 75.8% and contributing 11,361 ounces of gold. Key consumables include sodium cyanide (1.10 kg/t in 2025, representing ~50% of consumable cost), steel balls (1.28 kg/t, ~25% of cost), lime (1.95 kg/t), and sodium metabisulfite for cyanide detoxification (0.65 kg/t). The ore sorter, commissioned in 2020, processed 163,207 tonnes of low-grade Palito ore through 2025, upgrading feed at 1.73 g/t to a product averaging 9.79 g/t while rejecting 88% of the mass at 0.64 g/t, thereby reducing mill feed costs and waste volumes. Environmental management includes cyanide detoxification using the INCO air/SO2 process in a dedicated tank (93 m³, 1.5 hours residence) to reduce CNWAD to <5 ppm before tailings disposal. The plant’s continuous improvement is evidenced by the installation of new 185 m³ leach tanks in 2022–2023, boosting CIP retention time. Production peaked in 2025 at 44,169 ounces of gold, and the operation remains a cornerstone of Serabi’s Brazilian gold production. The integration of gravity concentration, flotation, and cyanidation allows flexible processing of variable ore types, maximizing overall gold and copper value recovery. Forward-looking, the plant’s proven performance and established infrastructure support sustained production from the Palito and São Chico deposits, with potential for additional throughput from ore sorting upgrades and further tailings retreatment campaigns.


Key Processes: Flotation, CIP/CIL, Cyanidation, Gravity Separation, Ball Mill, Crushing

Target Commodities: Gold, Silver, Copper

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Palito Mining Complex — 2025 Technical Report

Palito Mining Complex — 2025 Technical Report

Company Serabi
Date 2025
Region Pará State, Brazil
Commodities Gold, Silver, Copper
Throughput 500 t/d
Status Operating

Executive Summary

This technical report details the processing methods and operational performance of the Palito Mining Complex in Pará State, Brazil, operated by Serabi. The facility processes ore from both the Palito and São Chico mines with a plant capacity of 500 tonnes per day. The flowsheet is designed to handle complex ore types, utilizing a combination of crushing, grinding, copper flotation, and carbon-in-pulp (CIP) cyanidation to recover gold and silver values.

Key operational highlights include the integration of an ore sorting circuit to upgrade low-grade Palito ore prior to grinding, enhancing overall recovery efficiency. The São Chico ore is processed through a separate grinding circuit featuring gravity concentration and intensive cyanide leaching. The combined tailings from these circuits undergo CIP cyanidation, with gold and silver adsorbed onto activated carbon before elution and electrowinning to produce a final doré product.

The report provides comprehensive data on equipment specifications, consumable requirements, and operating performance from 2017 to 2022. Gold recovery rates have remained consistent, averaging around 92% for milled ore, with the ore sorter demonstrating significant value in upgrading low-grade material. The facility employs robust cyanide detoxification processes to ensure environmental compliance before tailings disposal.

Processing Overview

  • Crushing: Jaw Crusher (Metso 6240E), Cone Crushers (Faço, Sandvik)
  • Ore Sorting: XRT/Optical (Comex CXR-1000)
  • Grinding: Ball Mills (Humboldt Wedag, Zanini), Hydrocyclones (Weir Cavex)
  • Flotation: Emprotec Dual Cells (Rougher, Scavenger, Cleaner)
  • Leaching: CIP (Carbon-in-Pulp), Intensive Leach (Gekko ILR150)
  • Elution: Zadra Process
  • Detoxification: INCO Air/SO2 Process

Reports

Website: https://www.serabigold.com/operations/palito-complex/

Report Date: 2025

Region: Pará State, Brazil

Project Status: Operating

Commodity: Gold, Silver, Copper

Throughput: 500 t/d

Mine Life: 

Mine Type: 

Ore type:

Palito Mining Complex — 2023 Technical Report

Palito Mining Complex — 2023 Technical Report

Company Serabi
Mine Palito Mining Complex
Date 2023-11-20
Region Pará State, Brazil
Commodities Gold, Silver, Copper

Executive Summary

This technical report details the recovery methods and processing operations for the Palito Mining Complex in Pará State, Brazil, operated by Serabi. The facility processes ore from both the Palito and São Chico mines with a plant capacity of 500 tonnes per day. The processing flowsheet is designed to handle complex ore types, utilizing a combination of crushing, grinding, ore sorting, copper flotation, and cyanidation circuits to recover gold, silver, and copper values.

The Palito ore undergoes a primary crushing circuit followed by grinding and copper flotation. Gold and silver values from the flotation tailings are recovered via Carbon-in-Pulp (CIP) cyanidation. Low-grade development ore is upgraded using an XRT/optical ore sorter prior to grinding. The São Chico ore is processed through a separate grinding circuit that includes gravity concentration and intensive cyanide leaching of the gravity concentrate, with the tailings combined with the Palito flotation tailings for CIP processing.

The report outlines the equipment used throughout the process, including jaw and cone crushers, ball mills, hydrocyclones, flotation cells, and CIP tanks. Operating performance data from 2017 to 2022 indicates consistent milled ore tons and recovery rates, with total gold production reaching 31,819 ounces in 2022. The plant also includes a cyanide detoxification circuit using the INCO air/SO2 process to ensure environmental compliance before tailings disposal.

Website: https://www.serabigold.com/operations/palito-complex/

Report Date: 2023-11-20

Region: Pará State, Brazil

Project Status:

Commodity: Gold, Silver, Copper

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Palito Mining Complex — 2018 Technical Report

Palito Mining Complex — 2018 Technical Report

Company Serabi Gold
Date 2018
Region Brazil
Commodities Gold, Silver, Copper

Executive Summary

Serabi Gold operates a 500 t/d processing plant serving the Palito and São Chico mines within the Palito Mining Complex. The facility processes ore from two distinct sources with different metallurgical characteristics. Palito ore is treated through a circuit involving crushing, grinding, copper flotation, and Carbon-in-Pulp (CIP) cyanidation to recover gold and silver from the flotation tailings. São Chico ore follows a separate grinding circuit featuring gravity concentration and intensive cyanide leaching of the gravity concentrate, with the tailings combined into the main CIP circuit.

Production data from 2015 to 2017 indicates consistent operation with improving recovery rates. Palito ore gold recovery averaged approximately 91%, while São Chico ore recovery increased from 87.1% in 2015 to 95.8% in 2017 Q1. The plant also processes old flotation tailing stockpiles directly into the CIP circuit. Major equipment includes Metso jaw crushers, Faco cone crushers, Humboldt Wedag and Zanini ball mills, and Gekko Intensive Leach Reactors for gravity concentrates.

Processing Overview

  • Crushing: Primary Jaw Crusher (Metso 6240E), Secondary and Tertiary Cone Crushers (Faco 60S/TS/TF).
  • Milling: Ball Mills (Humboldt Wedag 2.3m, Zanini 2.1m) in closed circuit with cyclones.
  • Flotation: Copper flotation using Emprotec Dual Cells with thionocarbamate collector.
  • Leaching: Carbon-in-Pulp (CIP) for tailings, Intensive Leach Reactor (ILR) for gravity concentrate.
  • Refining: Electrowinning and smelting to produce doré.

Reports

Website: https://www.serabigold.com/operations/palito-complex/

Report Date: 2018

Region: Brazil

Project Status:

Commodity: Gold, Silver, Copper

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Mineral processing basics

Scroll to Top