Berta PEA Combines Crushed Heap Leaching and ROM Dump Leaching With Trucked PLS to the Nora SX-EW Plant in Chile
The 2014 preliminary economic assessment for Coro Mining's Berta copper oxide project near Inca de Oro describes 1.0 Mt/y of
The 2014 preliminary economic assessment for Coro Mining's Berta copper oxide project near Inca de Oro describes 1.0 Mt/y of
The 2022 preliminary economic assessment for the Belvedere gold project near Zvishavane describes crushing, closed circuit ball milling, four-stage rougher-scavenger
Golder's 2012 mine feasibility study update for Fortune Minerals' Arctos anthracite project describes washing about 125 million tonnes of run-of-mine
The 2015 updated pre-feasibility study for True North Gems' Aappaluttoq ruby project in Greenland describes a 111 t/d plant that
The 2014 preliminary economic assessment for Xtierra's Bilbao silver-lead-zinc project in Mexico describes a 720,000 t/y plant with a jaw
The December 2025 technical report on the Donald project in western Victoria, Australia describes a 7.5 Mt/y wet concentrator with
The 2016 preliminary economic assessment for Freegold's Golden Summit project near Fairbanks, Alaska, describes two 10,000 tpd gold streams: crushed
The 2018 preliminary economic assessment for ZincX's Akie project in British Columbia describes a 3,000 t/d mill fed by 4,000
The 2024 technical report on Cleveland-Cliffs' United Taconite property in Minnesota describes remote crushing at Thunderbird, a five-line magnetic separation
The 2024 technical report on Cleveland-Cliffs' Tilden property in Michigan describes eleven autogenous mills, selective flocculation ahead of silica flotation,