Marathon Feasibility Update Designs a 25,200 t/d SAG-Ball and Flotation Plant With HIG Regrind and SFR Cleaners for a Copper-PGM Concentrate
The Generation Mining Limited Marathon Property Pre-Feasibility Study (PEA) details a proposed open-pit mining operation in Ontario, Canada, targeting copper and platinum group metals (PGMs). The project utilizes a conventional crushing and grinding circuit followed by a split copper-PGM flotation flowsheet. The process plant is designed to treat 5 million tonnes per annum (Mtpa) in the first five years, with an expansion to 8 Mtpa planned for production year six onwards.





