Figure 14: SGS Conceptual Graphite Creek Flowsheet for the production of coarse (+80 Mesh) concentrate and fine concentrate

Graphite Creek — 2017 Technical Report (PEA)

This NI 43-101 Resource Update details the Preliminary Economic Assessment (PEA) for the Graphite One project, prepared by TRU Group in June 2017. The project envisions a vertically-integrated manufacturing model for high-grade coated spherical graphite, combining mining and mineral processing at the Graphite Creek property in Alaska with purification and value-added processing at a downstream Product Manufacturing Plant near a port.

Graphite Creek — 2017 Technical Report (PEA) Read Post »

Preliminary Economic Assessment – Decar Nickel Project

This report outlines the recovery methods for the Decar Nickel Project, focusing on the beneficiation of awaruite ore. The process design is based on test work conducted by SGS, utilizing physical separation methods due to the high specific gravity and magnetic susceptibility of awaruite. The flowsheet includes three stages of crushing and grinding, magnetic separation, regrinding in tower mills, and gravity concentration using Knelson concentrators.

Preliminary Economic Assessment – Decar Nickel Project Read Post »

Figure 2: SRC dense media separation process flow diagram.

Chidliak Project — PEA Technical Report

The Chidliak Project Preliminary Economic Assessment outlines a preliminary process flowsheet for the extraction and recovery of diamonds from CH-6 and CH-7 kimberlite material. Due to limited metallurgical data, the flowsheet relies on proven Northern Canadian kimberlite processing techniques designed for an Arctic operating environment. The plant is designed to treat 2,000 tonnes per day with a mine life of up to 13 years based on a potential mineable resource of 9.5 Mt.

Chidliak Project — PEA Technical Report Read Post »

Process diagram from technical-report PDF page 286

Caballo Blanco Gold Heap Leach Preliminary Economic Assessment

This report outlines the recovery methods for the Caballo Blanco Gold Heap Leach project conducted by Minera Cardel Resource Corp. The process begins with run-of-mine material from an open pit, transported via haul trucks to a crushing circuit. The material undergoes primary crushing with a jaw crusher and secondary crushing with a cone crusher to achieve a P80 of 38 millimeters before being transported to the heap leach pad.

Caballo Blanco Gold Heap Leach Preliminary Economic Assessment Read Post »

Farim Phosphate Project — 2023 Technical Report

This NI 43-101 Technical Report details the process design for the Farim Phosphate Project beneficiation plant and Mineral Terminal facility. The design utilizes physical separation processes to classify feed by size and reject impurities, producing a filtered bulk concentrate. The plant is designed to accommodate material from both the South pit (Years 1-7) and North pit (Years 8-25), with a nominal throughput of 219 dry t/h. The process includes scrubbing, desliming, classification, and dewatering stages before the concentrate is trucked to the Mineral Terminal for drying and ship loadout.

Farim Phosphate Project — 2023 Technical Report Read Post »

Technical Report for the Sandtown Frac Sand Property — 2016

The 2015 Technical Report for the Sandtown Frac Sand Property outlines the proposed processing methodology for extracting silica sand from sandstone deposits. Select Sands Corp plans to utilize an entirely mechanical process without chemical treatments, focusing on liberation and size classification to produce frac sand gradations of 30/50, 50/70, and 70/140 mesh, along with a fine product in the 200/400 mesh range. The design criteria aim for an annual production of approximately 882,000 short tons, utilizing a combination of dry primary crushing and wet processing circuits to remove contaminants and segregate size fractions.

Technical Report for the Sandtown Frac Sand Property — 2016 Read Post »

Figure 17-1: Ahafo South Process Flow Sheet

Ahafo South Operations — 2019 Technical Report

This NI 43-101 Technical Report details the processing operations at the Ahafo South mine in the Republic of Ghana, operated by Newmont. The facility commenced operations in 2006 and is designed to treat a blend of oxide and primary ore. The current throughput is projected to vary between 7.3 and 10.6 megatonnes per annum, depending on the ore blend from open pit and underground operations. The report outlines the existing Line 1 processing circuit and the planned Line 2 expansion project (AME), which aims to increase capacity by 3.5 Mt/a through the installation of new crushing and grinding equipment.

Ahafo South Operations — 2019 Technical Report Read Post »

Figure 17-1. Crushing Plant Flowsheet

Soledad Mountain Project — 2024 Technical Report

The 2024 Technical Report for the Soledad Mountain Project outlines the operational details of the recovery methods employed at the facility located in Kern County, California. The project utilizes a heap leach process for gold and silver recovery, with a crushing plant designed to handle an average throughput of 375,000 dry tons of ore per month. The crushing circuit is a three-stage system comprising a primary jaw crusher, a secondary cone crusher, and a tertiary High Pressure Grinding Roll (HPGR).

Soledad Mountain Project — 2024 Technical Report Read Post »

São Vicente Mine — NI 43-101 Technical Report

This NI 43-101 Technical Report outlines the recovery methods and metallurgical design criteria for the São Vicente Mine. The project targets an overall metallurgical recovery of 76%, with expected production of approximately 50,000 oz of saleable gold based on average mine feed grades. The processing strategy involves two distinct ore streams, DLO and CGO, which are treated differently to maximize gold recovery.

São Vicente Mine — NI 43-101 Technical Report Read Post »

Figure 88: Process Flow Schematic

Galaxy Gold Mine — 2013 Technical Report (Item 17)

This section of the Technical Report details the recovery methods and plant design for the Galaxy Gold Mine. The processing plant is currently on care and maintenance, with some equipment dismantled or corroded, requiring upgrades before commissioning. The proposed ramp-up plan involves treating both Run-of-Mine (RoM) material and historic tailings from the Hostel tailings dumps. The target throughput for this phase is 15 kilotonnes per month (ktpm), with the mill polishing tailings and crushing RoM to 80% passing 75 µm prior to flotation.

Galaxy Gold Mine — 2013 Technical Report (Item 17) Read Post »