Figure 1-5 - Overall Sulphide Flowsheet

Kharmagtai Project — 2025 Technical Report

This NI 43-101 Technical Report outlines the Pre-Feasibility Study (PFS) for the Kharmagtai Project, a development-stage open-pit mine operated by Xanadu. The project design focuses on a staged production strategy targeting a peak milled tonnage of 52 Mt/y over a 26-year mine life. The processing plant is designed to handle both sulphide and oxide ore types, utilizing a comprehensive flowsheet that includes comminution, flotation, gravity concentration, and carbon-in-leach (CIL) circuits. The design incorporates significant contingency measures, such as parallel trains for Stage 2 expansion, to ensure operational robustness and economic viability.

Kharmagtai Project — 2025 Technical Report Read Post »

Oyu Tolgoi process flowsheet: Basic Oyu Tolgoi Concentrator Flowsheet – Phase 1

Oyu Tolgoi — 2021 Technical Report

This NI 43-101 Technical Report details the development and operational status of the Oyu Tolgoi project in Mongolia, managed by the Oyu Tolgoi Joint Venture (OTLLC). The project is currently in a phased development stage, with Phase 1 commissioned in 2013 and Phase 2 focused on integrating underground feed from the Hugo North deposit. The concentrator facilities are designed to process ore from both the Oyut open pit and the Hugo North underground mine, utilizing a conventional semi-autogenous grind (SAG) mill and ball mill circuit followed by flotation.

Oyu Tolgoi — 2021 Technical Report Read Post »

Kingash — Preliminary Economic Assessment 2011

This report details the Hatch scoping study conducted in 2011 for the Kingash project, evaluating beneficiation, smelting, and refining options for the Kingashsky, Verkhnekingashsky, and Kuyovsky deposits. Three beneficiation options were analyzed: the Gipronikel flow sheet, the Valleriite Regrind flow sheet, and the Sulphidisation flow sheet. The study utilized mass and energy balances developed through METSIM™ modeling to assess capital and operating costs, ultimately selecting Option 2 (Valleriite Regrind) for the financial assessment due to its balance of recovery and cost.

Kingash — Preliminary Economic Assessment 2011 Read Post »

Goldex Mine — 2012 Technical Report

The Goldex Mine Technical Report dated October 14, 2012, outlines the recovery methods and processing plant status for the Goldex Mine. The plant was commissioned in 2008 and operated until October 2011, when mining was suspended and the facility entered care and maintenance. The report details a feasibility study proposing a reopening in 2013 with a design throughput of 5,100 tonnes per day.

Goldex Mine — 2012 Technical Report Read Post »

Figure 13-5: Flowsheet of the mill process at San Martin Mine

San Martin Mine — 2024 Technical Report

This section of the NI 43-101 Technical Report details the recovery methods employed at the San Martin Mill. The facility utilizes a conventional cyanidation process combined with the Merrill Crowe recovery method. The mill has a rated capacity of 1,100 tpd, though current operations average around 650 tpd based on data from April 2017 to April 2024. During this period, the mill achieved average recoveries of 86% for gold and 55% for silver.

San Martin Mine — 2024 Technical Report Read Post »

Old Nic Mine — 2012 Technical Report

The Old Nic Mine processing plant is designed to achieve an overall gold recovery rate of 90%, utilizing a combination of gravity concentration and carbon-in-pulp (CIP) leaching. Approximately 70% of the gold is recovered as free gold in gravity concentrators, specifically Knelson concentrators and James Tables, while the remaining gold is processed through a conventional CIP circuit. This hybrid approach targets the high proportion of free-milling gold (60-70%) found in the Old Nic ore.

Old Nic Mine — 2012 Technical Report Read Post »

A block flow diagram of the LHU process plant is presented in Figure 17.1.

Langer Heinrich Uranium Project — 2024 Technical Report

This NI 43-101 Technical Report details the processing facility and operational status of the Langer Heinrich Uranium Project (LHU) in Namibia, operated by Paladin Energy Limited. The facility was historically operational until 2018 and is currently undergoing a Restart Project to resume production. The report outlines the beneficiation and hydrometallurgical circuits, including ore handling, scrubbing, classification, leaching, ion exchange, and precipitation processes. Historical data from 2014 to 2018 indicates uranium recoveries generally above 80%, with recent years achieving 85-90%.

Langer Heinrich Uranium Project — 2024 Technical Report Read Post »

Figure 17-2: Simplified Process Flow Sheet

Great Atlantic Salt Project — 2025 Technical Report

This NI 43-101 Technical Report details the recovery methods and processing plan for the Great Atlantic Salt Project, operated by Atlas Salt Inc. The project involves underground mining of salt deposits to produce de-icing salt conforming to ASTM D632-12 specifications. The processing plant is designed to operate underground, utilizing conventional dry screening and crushing methods to achieve a maximum annual production rate of 4.0 million tonnes per annum (Mtpa). The facility includes a 190 m long processing area located at the bottom of a conveyor incline tunnel, equipped with double roll crushers and inclined vibrating screens.

Great Atlantic Salt Project — 2025 Technical Report Read Post »

Holt Mine — NI 43-101 Technical Report

This technical report details the recovery methods and process plant operations at the Holt Mine. The Holt Mill, constructed in 1988, has undergone expansions to reach a current throughput capacity of 3,000 tonnes per day. The facility utilizes a grinding circuit comprising a converted SAG mill, a ball mill, and a tertiary ball mill, followed by a Carbon-in-Leach (CIL) circuit for gold recovery.

Holt Mine — NI 43-101 Technical Report Read Post »