Kharmagtai Project — 2025 Technical Report
This NI 43-101 Technical Report outlines the Pre-Feasibility Study (PFS) for the Kharmagtai Project, a development-stage open-pit mine operated by Xanadu. The project design focuses on a staged production strategy targeting a peak milled tonnage of 52 Mt/y over a 26-year mine life. The processing plant is designed to handle both sulphide and oxide ore types, utilizing a comprehensive flowsheet that includes comminution, flotation, gravity concentration, and carbon-in-leach (CIL) circuits. The design incorporates significant contingency measures, such as parallel trains for Stage 2 expansion, to ensure operational robustness and economic viability.
Kharmagtai Project — 2025 Technical Report Read Post »