Figure 17-3 Simplified Process Flowsheet (KCA, 2021)

Updated Cerro Quema Pre-Feasibility Study — 2022 Technical Report

The Updated Cerro Quema Pre-Feasibility Study outlines the technical basis for the development of the Cerro Quema gold and silver project located in Panama. The project utilizes standard open-pit mining methods to extract ore from the La Pava and Quema-Quemita pits, with an estimated mine life of six years based on a modeled reserve of 21.7 million tonnes. The processing facility is designed to handle a throughput of 10,000 tonnes per day, utilizing heap leaching for oxide and mixed ore types.

Updated Cerro Quema Pre-Feasibility Study — 2022 Technical Report Read Post »

El Castillo Gold Mine — 2021 Technical Report

This NI 43-101 Technical Report covers the El Castillo Gold Mine located in Durango, Mexico, operated by Argonaut Resources. As of December 2021, the mine operates as a ROM-only heap leaching facility following the discontinuation of ore crushing at the end of 2019. The operation treats approximately 24,000 tonnes per day of run-of-mine ore across two leach pads, the East and West pads.

El Castillo Gold Mine — 2021 Technical Report Read Post »

Santa Fe Project — 2024 Technical Report (Recovery Methods)

This section of the 2024 Technical Report details the recovery methods for the Santa Fe Project, located in Nevada, USA. The project utilizes a standard heap leaching process designed to recover gold and silver from oxide and transitional ore types. The processing plant is designed for a throughput of 12,500 tonnes per day, with an expected annual throughput of 4.563 million tonnes. The mine is currently in the development phase, with processing scheduled to begin in Year 1.

Santa Fe Project — 2024 Technical Report (Recovery Methods) Read Post »

Lavoie Project – 43-101 Technical Report

The Lavoie Project Preliminary Economic Assessment assumes ore will be transported 365 km to the Matoush property for off-site processing. To mitigate transportation costs, automated ore sorting technology utilizing radiometric sensors is proposed. This system separates uranium-bearing ore from gangue on an individual rock basis by measuring gamma ray emissions, reducing the volume of material to be transported by approximately 42%.

Lavoie Project – 43-101 Technical Report Read Post »

Irokinda — 2012 Technical Report

This technical report section outlines the recovery methods and processing plant facilities at the Irokinda mine. The plant operates year-round with a main throughput of approximately 230,000 t/y and a third processing line of 40,000 t/y. The metallurgical process utilizes gravity and flotation circuits to produce a gravity concentrate for smelting and a flotation concentrate for off-site CIP treatment at the Zun-Holba mine. The facility includes crushing, grinding, gravity concentration, flotation, and tailings storage. A site inspection in May 2012 confirmed the plant was well maintained.

Irokinda — 2012 Technical Report Read Post »

Kings Valley Lithium Project — 2012 Technical Report

This Preliminary Feasibility Study (PFS) outlines the processing methods for the Kings Valley Lithium Project. The plant is designed for a throughput of 2,100 tpd, operating 365 days per year. The facility consists of a dry ore preparation circuit and a wet recovery circuit. Key products include Lithium Carbonate (Li2CO3), Potassium Sulfate (K2SO4), and Sodium Sulfate (Na2SO4). The process utilizes roll crushers, Raymond mills, and a rotary calciner for ore preparation, followed by agitated tank leaching and crystallization for product recovery.

Kings Valley Lithium Project — 2012 Technical Report Read Post »

Solwara 1 — Technical Report

This technical report outlines the proposed mineralised material treatment route for the Solwara 1 project by Nautilus. Currently, there are no Mineral Reserve estimates, and the potential viability has not been supported by a pre-feasibility or feasibility study. The terms mineralised material and material denote mineralised material above an economic cut-off grade on which the proposed mining, processing, and product shipping activities are designed to operate.

Solwara 1 — Technical Report Read Post »

Record Ridge Project — 2022 Technical Report

This NI 43-101 Technical Report presents a Preliminary Economic Assessment (PEA) for the Record Ridge Project in British Columbia, Canada, developed by WHY Resources. The study outlines a process to extract magnesium from magnesium oxide bearing material with a treatment rate of 3,000 tonnes per day. The proposed flowsheet utilizes a hydrometallurgical approach involving crushing, grinding, and sulfuric acid leaching to recover magnesium.

Record Ridge Project — 2022 Technical Report Read Post »

COSE Project — 2012 Technical Report

This section of the NI 43-101 Technical Report details the metallurgical testing and process route selection for the COSE Project. SGS Minerals Services in Santiago, Chile conducted a series of tests on 25 composite samples derived from 70 individual samples across oxidized, partially oxidized, and non-oxidized portions of fault-hydrothermal breccia hosted and veinlet gold mineralization. The testing included screen fire assays, gravitational concentration using a Knelson concentrator, and bottle roll cyanide leaching tests.

COSE Project — 2012 Technical Report Read Post »