Monterde Project Technical Report
This technical report outlines the recovery methods for the Monterde Project, based on metallurgical testwork and engineering design appropriate for a preliminary economic assessment. The proposed processing plant is designed to treat 2,800 tonnes per day of ore, utilizing a conventional gold and silver recovery circuit. The design focuses on maximizing metal recovery while minimizing capital and operating costs through the use of agitated tank cyanide leaching, counter current decantation, and a Merrill Crowe finishing step.
Monterde Project Technical Report Read Post »

