admin

Mt. Hamilton Gold and Silver Project — 2014 Technical Report

The Mt. Hamilton Project is a gold and silver development project located in Nevada, USA, utilizing an open-pit mining method with a heap leach recovery process. The project is designed to process a leachable reserve of approximately 22.5 Mt of crushed ore from the Seligman and Centennial open pits. The recovery method involves a multi-lift heap leach with a carbon ADR (Adsorption, Desorption, Refining) plant, which was designed by KCA of Reno, Nevada, to facilitate detailed costing and construction scheduling for the 2014 Feasibility Study.

Mt. Hamilton Gold and Silver Project — 2014 Technical Report Read Post »

Eagle Gold Mine — 2023 Technical Report

This technical report section details the process description and recovery methods for the Eagle Gold project. The gold recovery process is designed to leach approximately 11.5 Mt of ore per year with an average gold head grade of 0.65 g/t at an overall gold recovery of 76%. The operation utilizes a three-stage crushing plant operating at a nominal primary crushing rate of 29,500 t/d, feeding a Heap Leach Pad (HLP) system.

Eagle Gold Mine — 2023 Technical Report Read Post »

Figure 17-1. Demonstration Project Process Flowsheet (RER, 2022)

Technical Report on the Bear Lodge REE Project

This chapter outlines the recovery methods for the Bear Lodge Rare Earth Element (REE) Project. While the mineral processing for the updated mineral resource estimate has not been fully defined, a demonstration project plant was established to process a bulk exploration sample from the Bull Hill deposit. This sample averaged 10.1% total rare earth oxide (TREO) and was used to support the separation and processing demonstration project.

Technical Report on the Bear Lodge REE Project Read Post »

Bolivar Technical Report PEA — 2020

This technical report section details the operational performance and processing methods of the Piedras Verdes concentrator operated by Sierra Metals Inc. The plant utilizes a conventional concentration process including crushing, grinding, flotation, thickening, and filtration. Operational data from July 2018 to December 2019 indicates an average throughput of 3,224 tonnes per day, with improvements seen in Q4 2019 reaching 3,787 tpd.

Bolivar Technical Report PEA — 2020 Read Post »

Omai Gold Property PEA — 2024 Technical Report

This Pre-Feasibility Study outlines a proposed processing rate of 3,280,000 tpa (9,000 tpd) for the Omai Gold Property. The design leverages historical experience from 1993 to 2005 operations by OGML, utilizing a combination of hard rock and soft material processing. The proposed flowsheet includes a gyratory crusher feeding a SAG mill circuit, followed by gravity concentration and leaching.

Omai Gold Property PEA — 2024 Technical Report Read Post »

Figure 17-1: Conceptual Heap Leach Flowsheet

Long Valley Project — 2021 Technical Report

This NI 43-101 Preliminary Economic Assessment (PEA) outlines the Long Valley Project, a proposed open-pit mining operation designed for the extraction of gold and silver. The project employs a conventional heap leach system operating on a 365-day, 24-hour basis. The processing circuit begins with crushing run-of-mine material to a P80 of 1.5 inches, followed by agglomeration with cement and lime. The material is then stacked on a lined pad and irrigated with dilute cyanide solution to leach precious metals.

Long Valley Project — 2021 Technical Report Read Post »

Figure 17-1 Process Overall Flowsheet

Taguas Heap Leach Project — 2021 Technical Report

The Taguas Heap Leach Project Preliminary Economic Assessment (PEA) outlines a mining and processing plan for the Cerros Taguas oxide mineral resource. The project utilizes standard open pit mining methods to extract material containing gold and silver values. The ore is amenable to heap leaching, with a design to process 5.475 million tonnes per year at an average rate of 15,000 tonnes per day. The estimated mine life for the project is 9.2 years.

Taguas Heap Leach Project — 2021 Technical Report Read Post »

Scroll to Top