Mineral Processing Circuit

Goldboro Project — 2021 Technical Report

This Feasibility Study outlines the process design for the Goldboro Project, focusing on a conventional leach and carbon-in-pulp (CIP) process route selected for its suitability to the deposit and project economics. The proposed flowsheet utilizes standard gold recovery technologies, including a three-stage crushing circuit, ball mill grinding, and gravity concentration prior to intensive leaching. The plant is designed for a nominal throughput of 4,000 tonnes per day (1.46 Mtpa) with a target total gold recovery of 96% over the life of the mine.

Goldboro Project — 2021 Technical Report Read Post »

Figure 17-1: The Granites Plant Process Flowsheet

Tanami Operations — 2019 Technical Report

This section of the NI 43-101 Technical Report details the recovery methods and processing plant design for The Granites underground mine operated by Tanami Operations in the Northern Territory. The plant, originally constructed in 1986, has undergone significant upgrades including the TEP (Tanami Expansion Project) commissioned in Q3 2017. The current configuration features a 3-stage crushing circuit feeding a primary and secondary ball mill circuit, followed by gravity concentration and Carbon-in-Leach (CIP) recovery. The plant is currently operating at feed rates between 300 to 350 tph, with a design capacity of 333 tph and achieved rates up to 390 tph.

Tanami Operations — 2019 Technical Report Read Post »

Ekati 2016 Report: 10,800 dmt/d Kimberlite Plant With HPGR Re-Crush, Twin DMS Modules and X-Ray Recovery Adds a Fines DMS and Prepares for Jay Ore

This NI 43-101 Technical Report details the recovery methods and process plant operations for the Ekati Mine in the Northwest Territories, Canada. The process plant has a design capacity of 15,500 t/d, with a current budgeted throughput of 12,320 dmt per operating day. The facility utilizes a comprehensive flowsheet designed for kimberlite processing, involving primary, secondary, and tertiary crushing stages followed by heavy media separation and various sorting technologies.

Ekati 2016 Report: 10,800 dmt/d Kimberlite Plant With HPGR Re-Crush, Twin DMS Modules and X-Ray Recovery Adds a Fines DMS and Prepares for Jay Ore Read Post »

Nichols Ranch Unit process flowsheet: Nichols Ranch Plant Flow Sheet

Nichols Ranch Unit — Technical Report

This section of the technical report details the recovery methods and processing plant design for the Nichols Ranch Unit. The facility is licensed and designed to operate three major solution circuits: the recovery/extraction circuit, the elution circuit, and the yellowcake slurry production circuit. Currently, only the recovery/extraction circuit is constructed and operated on-site at the Nichols Ranch Unit processing facility. The plant utilizes an ion exchange system to extract uranium liberated underground from the circulating lixiviant flow.

Nichols Ranch Unit — Technical Report Read Post »

Figure 17-3 Simplified Process Flowsheet (KCA, 2021)

Updated Cerro Quema Pre-Feasibility Study — 2022 Technical Report

The Updated Cerro Quema Pre-Feasibility Study outlines the technical basis for the development of the Cerro Quema gold and silver project located in Panama. The project utilizes standard open-pit mining methods to extract ore from the La Pava and Quema-Quemita pits, with an estimated mine life of six years based on a modeled reserve of 21.7 million tonnes. The processing facility is designed to handle a throughput of 10,000 tonnes per day, utilizing heap leaching for oxide and mixed ore types.

Updated Cerro Quema Pre-Feasibility Study — 2022 Technical Report Read Post »

El Castillo Gold Mine — 2021 Technical Report

This NI 43-101 Technical Report covers the El Castillo Gold Mine located in Durango, Mexico, operated by Argonaut Resources. As of December 2021, the mine operates as a ROM-only heap leaching facility following the discontinuation of ore crushing at the end of 2019. The operation treats approximately 24,000 tonnes per day of run-of-mine ore across two leach pads, the East and West pads.

El Castillo Gold Mine — 2021 Technical Report Read Post »

Santa Fe Project — 2024 Technical Report (Recovery Methods)

This section of the 2024 Technical Report details the recovery methods for the Santa Fe Project, located in Nevada, USA. The project utilizes a standard heap leaching process designed to recover gold and silver from oxide and transitional ore types. The processing plant is designed for a throughput of 12,500 tonnes per day, with an expected annual throughput of 4.563 million tonnes. The mine is currently in the development phase, with processing scheduled to begin in Year 1.

Santa Fe Project — 2024 Technical Report (Recovery Methods) Read Post »

Irokinda process flowsheet: Irokinda Processing Plant Flowsheet

Irokinda — 2012 Technical Report

This technical report section outlines the recovery methods and processing plant facilities at the Irokinda mine. The plant operates year-round with a main throughput of approximately 230,000 t/y and a third processing line of 40,000 t/y. The metallurgical process utilizes gravity and flotation circuits to produce a gravity concentrate for smelting and a flotation concentrate for off-site CIP treatment at the Zun-Holba mine. The facility includes crushing, grinding, gravity concentration, flotation, and tailings storage. A site inspection in May 2012 confirmed the plant was well maintained.

Irokinda — 2012 Technical Report Read Post »

Scroll to Top