Goldboro Project — 2021 Technical Report
This Feasibility Study outlines the process design for the Goldboro Project, focusing on a conventional leach and carbon-in-pulp (CIP) process route selected for its suitability to the deposit and project economics. The proposed flowsheet utilizes standard gold recovery technologies, including a three-stage crushing circuit, ball mill grinding, and gravity concentration prior to intensive leaching. The plant is designed for a nominal throughput of 4,000 tonnes per day (1.46 Mtpa) with a target total gold recovery of 96% over the life of the mine.
Goldboro Project — 2021 Technical Report Read Post »





