Kobada Gold Project — 2024 Technical Report

Kobada Gold Project — 2024 Technical Report

Company Kobada Gold Project
Date 2024
Region Nigeria
Commodities Gold
Mine Type Open Pit
Throughput 3 Mt/a
Mine Life 16 years
Annual Production 100,000 oz Au
Status Development

Executive Summary

The Kobada Gold Project Technical Report outlines the recovery methods for a processing plant designed to treat oxide ores initially, transitioning to sulphides as the mine life progresses. The plant utilizes a gravity/CIL technology with a throughput of 3 Mt/a. The process includes crushing, milling, gravity recovery of free gold, and Carbon-in-Leach (CIL) for the remaining gold. The design is phased, with the first phase treating oxides using a single-stage ball mill and primary crushing, and a second phase adding secondary crushing and milling for sulphides.

Processing Profile

  • Crushing: Primary Jaw Crusher (Oxide), Secondary/Tertiary Cone (Sulphide)
  • Milling: Ball Mill (Single stage Oxide, Two stage Sulphide)
  • Gravity: Centrifugal Concentrator
  • Leaching: Carbon-in-Leach (CIL), Intensive Cyanidation

Reports

Website: https://toubaniresources.com/project/

Report Date: 2024

Region: Nigeria

Project Status: Development

Commodity: Gold

Throughput: 3 Mt/a

Mine Life: 16 years

Mine Type: Open Pit

Ore type: 