Vizcachitas Project — 2022 Technical Report

The proposed processing plant is designed for a capacity of 136,000 t/d, employing HPGR crushing, ball milling, bulk and selective flotation, and dry stacked filtered tailings.

Report context

This technical report, dated 2022, details the recovery methods for the Vizcachitas Project. The concentrator is designed for a capacity of 136,000 t/d and is located in two areas within the Rocín River valley: the crushing and grinding circuits on a platform of compacted waste rock, and the wet area down the valley on a natural plateau next to the access road on the east side of the valley.

Processing route

Crushing and grinding

The run of mine material is fed to a primary crusher (MK60-110E) where it is reduced to 7 inches, and then to three secondary cone crushers (2,500 HP) in open circuit. The crushed product of 2 inches is stored in a surge bin that feeds the tertiary crushing circuit that includes two HRC3000 high pressure grinding roll (HPGR) crushers arranged in a closed circuit with banana screens.

The undersize from the crushing plant (P80 < 3.5 mm) is fed to two 23 MW ball mills arranged in a reverse closed circuit with hydrocyclones to achieve a P80 of 240 μm. The overflow from the hydrocyclones is thickened to 50% solids %wt and then transported via a concrete launder to the flotation area.

Flotation

The flotation circuit has two stages: a Cu-Mo bulk flotation and a Cu-Mo selective flotation. Both circuits use mechanically agitated tanks and column cells to produce concentrates. The bulk flotation includes a rougher flotation stage of 24 TankCell e500 cells arranged in two parallel lines operating at a pH near 7. The rougher concentrate is reduced to P80 = 25 μm in three HIG mills (HIG 5000) and then fed to three 5 m diameter x 13 m cleaner columns operating at a pH of 12. The selective Cu-Mo flotation stage includes rougher flotation and several cleaner stages in counter-current arrangement, with sulphuric acid and sodium hydrosulphide added to maintain the pH around 9 and the pulp potential near -450 mV.

Concentrate handling

The copper concentrate is filtered and then loaded and stored in Rotainers to be hauled by trucks to the port of Ventanas. The molybdenum concentrate is filtered and stored in bags to be hauled by truck to the port of Ventanas or to alternative destinations agreed with buyers. The concentrator produces clean concentrates of approximately 24% Cu.

Tailings dewatering and disposal

The tailings from flotation are classified using hydrocyclones. The coarse fraction is fed to belt filters and the fine fraction is thickened and then filtered in pressure filters. The filtered cake contains an average moisture of 15% and is disposed of in 2 m layers co-mingled with mine waste rock, in the bottom and across the valley to shape the dry stacked filtered tailings deposit.

Water supply and management

The concentrator water supply will be supplied by a third party (Desala Petorca SpA) from a desalination plant located in Papudo to a pump station located near Cabildo. The water is pumped to Vizcachitas in a 26 inch diameter, 90.6 km long pipeline. Three 49,000 m³ water storage ponds are included: fresh water storage pond #1, process water storage pond #2, and recovered water storage pond #3.

Key reported parameters

Parameter Value Unit Basis
Concentrator capacity 136,000 t/d Design
Primary crusher product size P80 7 in inches Design
Secondary crusher product size 100% -2 in inches Design
HPGR product size P80 < 3.5 mm mm Design
Ball mill product size P80 240 μm μm Design
Ball mill power (each) 23 MW Design
Flotation feed density 50 % solids Design
Rougher concentrate regrind size P80 25 μm μm Design
Filtered tailings moisture 15 % Design
Copper concentrate grade ~24 % Cu Design
Make-up water consumption 271 (max 300) L/s Design
Power consumption 16.6 kWh/t Design
Total installed power 139 MW Design
Testwork source (main) SGS, 2021 , Testwork
Crushing and grinding equipment selection Metso:Outotec , Based on testwork and simulations
Tailings filtration sizing Takraf , Based on laboratory and pilot testwork
Ball mill sizing methodology Bond methodology with phantom cyclone adjustment , Calculations by Metso:Outotec
Mass balance simulation JKSimMet 6.3 , Nominal design values

Project website: https://losandescopper.com/projects/overview/

Project website: https://losandescopper.com/projects/history/

Technical qualifications

The plant design and the equipment selection are backed up by bench-scale testwork and some pilot plant testwork carried out using representative composites of the first years of operation. The main design criteria are based on results obtained from the PFS testwork carried out on representative samples (SGS, 2021). Mass balances and simulations were calculated in JKSimMet 6.3 using nominal design values. Crushing and grinding equipment were selected and sized by Metso:Outotec based on PFS testwork (Drop Weight Test, Bond Abrasion Index and Bond Work Index), PBT tests performed in York, PA and subsequent simulations using Metso's proprietary BRUNO simulation software (Metso, 2020; Metso:Outotec 2022). The tailings water recovery equipment requirements were calculated by Takraf based on laboratory and pilot filtration testwork (Takraf, 2021). Characteristics for sizing the concentrate thickeners and filters were based on vendor databases using similar feeds. The overall power consumption includes a 10% allowance on the flotation and water recovery stages.

Source: Vizcachitas Project , 2022 Technical Report, Sections 1.17 and 17 (Recovery Methods), pages 17, 270–286.