| Company | Mindoro Resources Ltd |
| Date | Unknown |
| Commodities | Nickel |
| Status | Development |
| Consultant | Reid Resource Consulting Pty Ltd |
Executive Summary
This technical report section outlines the proposed recovery methods for the Agata nickel laterite project. A flowsheet has been developed for thermal upgrading, with design and costing completed. The study includes projected volumes and costs for consumables such as diesel, coal, fresh water, and maintenance materials.
However, the nature of this study did not include quantification of suitable feedstock for thermal upgrading. It also did not attempt to establish whether the samples tested were representative of the Agata nickel laterite deposit. These critical matters are expected to be addressed in the subsequent Pre-Feasibility Study (PFS) once the preferred products for sale are clarified.
The proposed flowsheet is generically suitable for thermal upgrading, providing a foundational design for future cost estimation and operational planning.
Website: https://www.irw-press.com/en/news/mindoro-resources-ltd-updated-resource-estimate-released-for-agata-north-nickel-laterite-project.html?isin=CA6029131050
Report Date: Unknown
Region:
Project Status: Development
Commodity: Nickel
Throughput:
Mine Life:
Mine Type:
Ore type:

