Paca Silver-Zinc-Lead Deposit Technical Report

Company Prophecy
Date 2015
Region Bolivia
Commodities Silver, Zinc, Lead

Executive Summary

This technical report details the status of the Paca Silver-Zinc-Lead Deposit as of November 2015. The report indicates that detailed metallurgical recovery and process studies for the Paca deposit have not been completed by Prophecy at the time of publication. Consequently, specific operational parameters regarding ore processing and recovery rates are not yet established.

Infrastructure considerations have been initiated by Prophecy to support the evaluation of potential future development models for the project. These efforts are being conducted in conjunction with separate infrastructure assessments for the nearby Pulacayo site, which is located approximately 7 km to the south of the Paca deposit. These infrastructure evaluations were ongoing at the effective date of the report.

Due to the incomplete nature of the metallurgical studies, the report does not contain definitive data on mine life, annual production, or throughput. The project remains in an early evaluation phase, with infrastructure planning serving as the primary activity to support future development decisions.

Website: https://silverelef.com/prophecy-development-corp-files-technical-report-for-mineral-resource-estimate-for-the-pulacayo-projects-paca-silver-zinc-lead-deposit/

Report Date: 2015

Region: Bolivia

Project Status:

Commodity: Silver, Zinc, Lead

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top