Executive Summary
This NI 43-101 Technical Report, prepared by SRK Consulting, addresses the Tuzon project. The document explicitly states that no Mineral Reserve Estimates have been undertaken, and no Mineral Resources have been assessed for potential economic viability in the form of a study. As a result, a detailed discussion of recovery methods is not within the scope of this technical report. The text references Section 13 for the minimum discussion of completed metallurgical testwork results required to support Reasonable Prospects for Eventual Economic Extraction (RPEEE).
The report indicates that the project is in an early stage of development, as evidenced by the absence of reserve estimates and the limited scope regarding recovery methods. This suggests that the project is currently focused on initial exploration and resource definition rather than production or detailed metallurgical processing. The lack of specific operational data in this section highlights the preliminary nature of the technical assessment provided in this document.
Reports
Website: https://www.pasofinogold.com/pasofino-news/pasofino-gold-announces-an-updated-mineral-resource-estimate-mre-for-the-dugbe-gold-project
Report Date: September 2020
Region:
Project Status: Exploration / Early Stage
Commodity: Not Specified
Throughput:
Mine Life:
Mine Type:
Ore type: