Venice Mine Complex — 2012 Technical Report

Company New Dawn Mining Corp
Date 20 December 2012

Executive Summary

This technical report outlines the status of the Venice Mine Complex processing infrastructure as of December 2012. The report confirms that the processing plant is no longer operational; all equipment from the old mill has been stripped and relocated to Falgold’s other properties following the closure of mining operations.

Water supply for the complex is managed through a combination of sources, primarily a pipeline from Claw Dam, which serves as the major municipal water source for Kadoma. Additional water is available from small dams on the complex, including the What Cheer Dam and Venice Dam, as well as a small dam near Grandeur Mine. Limited water is also drawn from underground resources via boreholes, with usage controlled by the Mine Engineer.

Regarding energy requirements, the report notes that if Venice Mine were to resume operations, it would need to apply to ZESA for continuous, uninterrupted power installation. Current water usage remains under the control of the Mine Engineer, ensuring regulated consumption across the complex assets.

Operational Details

Reports

  • reports/2012_New_Dawn_Mining_Venice_Mine_Complex

Website: https://www.miningreview.com/top-stories/new-dawn-buys-controlling-interest-in-central-african-gold/

Report Date: 20 December 2012

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top