Goliath Gold Complex — 2023 NI 43-101 Technical Report
This section of the NI 43-101 Technical Report details the recovery methods for the Goliath Gold Complex pre-feasibility study. The proposed process design utilizes standard gold recovery technologies with a nominal throughput of 6,460 t/d. The flowsheet includes two-stage crushing, SAG and ball milling, gravity recovery, and a Carbon-in-Leach (CIL) circuit.
Goliath Gold Complex — 2023 NI 43-101 Technical Report Read Post »

