Las Chispas Project — 2021 Technical Report
The Las Chispas Project Technical Report outlines a feasibility study for a gold and silver processing plant with a nominal throughput of 1,250 t/d. The flowsheet utilizes a conventional comminution circuit featuring a primary jaw crusher and a single-stage SAG mill closed with cyclones. The process includes bulk rougher flotation to generate a high-grade concentrate, followed by cyanide leaching circuits for both the concentrate and flotation tailings.
Las Chispas Project — 2021 Technical Report Read Post »








