Executive Summary
The Yellowjacket Gold Project 2011 Technical Report details the processing plant configuration for the project. The facility employs a crushing circuit featuring a 60 cm jaw crusher and a 60 cm double roll crusher, though the jaw crusher is the primary unit for production crushing following the implementation of a SAG mill. The grinding circuit consists of an open circuit SAG mill followed by a closed circuit ball mill, with cyclone classification managing the grind size.
Gold recovery is achieved through a gravity concentration process rather than cyanidation. The plant utilizes two Knelson CD-20 Concentrators for primary and scavenging recovery, feeding into a Deister shaker table for final concentrate cleaning. The mill is currently powered by a diesel generator, with plans to connect to the local hydroelectric grid. Future plans include enclosing the outdoor mill facility.
Reports
Website: https://www.eagleplains.com/news/eagle-plains-completes-100-acquisition-yellowjacket-gold-project
Report Date: 2011
Region:
Project Status:
Commodity: Gold
Throughput:
Mine Life:
Mine Type:
Ore type: