NX Gold Mill Recovers Over 75% of Its Gold by Falcon and Intensive Cyanidation, Then Floats and Leaches a Carbonaceous Concentrate
Ero Copper's January 2019 technical report on the NX Gold Mine in Mato Grosso, Brazil describes a 2012 plant running
Ero Copper's January 2019 technical report on the NX Gold Mine in Mato Grosso, Brazil describes a 2012 plant running
Mine Development Associates' May 2014 preliminary economic assessment for InZinc's West Desert project in Utah recovers about half of the
The May 2015 revised flotation PEA for Ecuador Gold and Copper's Santa Barbara project in southeast Ecuador sizes a 10
Micon's October 2013 preliminary economic assessment for the Rojo Grande deposit in San Juan Province plans three-stage crushing to 12.5
Ausenco's 2021 preliminary economic assessment for Probe Metals' Val-d'Or East project in Quebec plans a three-stage crush, ball mill, gravity
West African Resources' April 2015 pre-feasibility study for the Mankarga 5 gold deposit in Burkina Faso describes a heap leach
Avalon's September 2018 preliminary economic assessment for the Separation Rapids lithium deposit near Kenora, Ontario stops at flotation concentrates, with
WSP's May 2015 preliminary economic assessment for Timberline Resources' Talapoosa gold-silver project in Lyon County sizes a 10,460 t/d heap
The January 2015 preliminary economic assessment for the Strieborná project in eastern Slovakia designs a small concentrator with eight rougher-scavenger
Magna Mining's January 2022 feasibility study for the Shakespeare project near Espanola, Ontario describes jaw crushing, a SAG and ball